Tags for this Online Resume:
auxiliary operator, electric utility, power plants
Tags for this Online Resume:
SMAW, GMAW, FCAW, Air carbon arc cutting, Plasma arc cutting, Auxiliary equipment
Seeking a challenging position in Energy Production
Tags for this Online Resume:
Auxiliary, Operator, Reactor, Nuclear, Power, Energy
looking for long term opportunity in Franklin, NC
Ideal Companies: Growing, staying in the USA
Tags for this Online Resume:
manager
to work with a manufacturing company that have growth within the company
Very high leadership skills, makes good decisions in a short notice. Respectful, disciplined and hard worker willing to learn any aspect of a job.
Ideal Companies: comcast, iron mountain, toys r us, william lea, university of Chicago
Tags for this Online Resume:
Security, driver, transportation, law enforcement, warehouse, supervisor
Not only do I want to work for a winning team. But a company I can become a valuable employee for my employer
Ideal Companies: CONTACT INFO, Jeff Parmalee, 1507 Lincoln Ave.Apt 2, Utica, N.Y.13502, US, JEFF_PARMALEE@yahoo.com, Home 1-315-732-0596, Mobil 1-315-723-7846, RESUME ^BACK TO TOP, Resume ID: 27538068 Resume Headline: Qualified Installer, OBJECTIVE: To become part of a growing and winning team., EXPERIENCE: 6/2003 - Present Ajilon Cherry Hill, New Jersey, INSTALLER, With this company I have installed Nortel Optera Rings in the western part of the United States. I also installed Succession switches for Nortel in the state of Pennsylvania.I also participated in a fiber loop project for Nortel throughout the states of Wissconsin and Minnesotta, 9/2002 - 6/2003 Rightech Staten Island, N.Y., INSTALLER, Worked in hubs at the base of cell towers. My job entailed reading of prints and checking alarms, mounting auxiliary panels, lugging and crimping of cables, hotslides and the setting of rectifiers, and h-tapping for a BTS Nokia project. These were unmanned environments with no supervision. The work was performed for Tyco and Cingular., 8/2000 - 9/2002 Comforce Cortland, N.Y., INSTALLER, Same work as with the company Professional Teleconcepts (see below)., 12/1995 - 8/2000 Professional Teleconcepts Norwich, NY, INSTALLER, Performed various tasks including reading and correcting blue prints, drilling floors, leveling and mounting bays, running, stitching, and terminating cables (power, line, fiber and coax), and building auxiliary framing (ladder rack, unistrut, threaded rod, and aux bar)and fiber duct. Have installed the following equipment: Nortel DMS 10, 100/200, 250, 300, 500 Voice Modules Access Nodes, jnet to enet conversions, passport bays, and spm bays. Also worked on Fujitsu such as FLMs and MUXs, Hendry fuse panels, and Telabs Titan 5500s, 2600sand the 1024 Also have installed the following: Alcatel, Litespan2000, Cisco Routers; have worked on B.D.F.B.s and Lorains and have assisted the Marconi company in various power jobs. Have worked installing battery strings and ground bars, AT&T Lineage and Galaxy bays, and all kinds of wire wrapping terminations. Have also done tearouts, mining of cables, and mainframe cut-overs., EDUCATION: 6 / 1988 NORWICH HIGH SCHOOL US - N.Y. - Norwich, High School or equivalent, LANGUAGES: Languages Proficiency Level, English, REFERENCES: Reference Name: Richard Carpenter, Reference Company: PAIR GAIN, Reference Title: Engineer, Phone: 1-(607) 627-6790, Type: Professional, Reference Name: Justin Munro, Reference Company: Mainline Communications, Reference Title: Installer, Phone: 1-607-316-7049, Type: Professional, Reference Name: Ray Buss, Reference Company: RIGHTECH, Reference Title: Installer, Phone: 1-(607)-674-4816, Type: Personal, ADDITIONAL, INFORMATION: I am Trompeter certified
Tags for this Online Resume:
Installer
• CARRIED OUT OPERATION & MAINTENANCE WORK ON CATERPILLAR GAS ENGINES (G-3516.S.I.T.A G-3516-B) FROM 26 -10-1990 TO DATE.
• CARRIED OUT INSTALLATION & ERECTION OF GAS ENGINE CONTROL PANELS.AUXILIARIES PANELS.CONTROL CABLING.POWER CABLING OF GEN SETS H.T & L.T SWITCH GEAR SYSTEM.
• INSTALLATION & ERECTION OF COOLING TOWERS.
• INSTALLATION & ERECTION RAW WATER COOLING SYSTEM.
• INSTALLATION & ERECTION OF SOFTENING PLAN...
Tags for this Online Resume:
Good analytical skill, Good operational skill, Time management, Maintenance planer, Good Erctor and fabricator, Friendly manager
MCM-University
Manufacturing Capabilities Management
BS Degree in Manufacturing Capabilities Management degree program.
Economic development through education stimulus management
Micro Business Incubator Management and development
Work Team and problem solving skills development
Manufacturing Technology Management
APPRENTICESHIP and INTERNSHIP
WORKFORCE DEVELOPMENT PROGRAM
PROPOSAL BY
Gilbert Gary Mendoza
Contact ...
Im looking for a job wherein i can give my maximum potential and be a part of a team where all staff are working in focus and organized.
Ideal Companies: ISP, Telecommunications and IT related job
Tags for this Online Resume:
PC, Cabling, CD Writers, Computers, Ethernet Devices, Expansion Boards, Gateway Computers, Hard Drives, Handheld Devices, Hardware Upgrades, Laptops, LANs/WANs, Modems, Motherboards, Network Configurations, Network Interfaces, NIC Cards, PC Hardware Configuration, Peripheral Hookups, Printers, Rack Systems, Random Access Memory (RAM), Routers, SCSI Systems, Scanners / Imaging Devices, Servers, SGI, SUN Solaris, TCP/IP-based Networking, USB Ports, Cisco routers, Cisco switches, Juniper SSG5. Microwave radio (Allgon, SAF, Ceragon, Stratex, Nera), Multiplexers, converters, Spectrum Analyzer (Anritsu SiteMaster), 3G modems, Fusion machine, Cable analyzer (Fluke), tone tracer, BER Tester, Allot(NetEnforcer), Barracuda, iDirect, Gilat modems, Node B and INC(IPWireless), DOS, UNIX (Solaris), Windows Family (9x/NT/2000/XP/Vista), Ethernet Connections, Firewalls, IP Addresses, IT Solutions, LAN / WAN Technology, Multiple Locations, Network Architecture, Network Equipment, Network Operating Systems, Network Security, Network Testing, Network Upgrading