Climber_bannerad_300x250_15s

Want your profile here?

Becoming a member is easy!

Climber.com works with you to help you advance your career by putting you directly in front of tens of thousands of recruiters in your field. Sign up today on Climber.com

RssCAPTIVE POWER PLANT CHIEF ENGINEER PAKISTAN.

• CARRIED OUT OPERATION & MAINTENANCE WORK ON CATERPILLAR GAS ENGINES (G-3516.S.I.T.A G-3516-B) FROM 26 -10-1990 TO DATE. • CARRIED OUT INSTALLATION & ERECTION OF GAS ENGINE CONTROL PANELS.AUXILIARIES PANELS.CONTROL CABLING.POWER CABLING OF GEN SETS H.T & L.T SWITCH GEAR SYSTEM. • INSTALLATION & ERECTION OF COOLING TOWERS. • INSTALLATION & ERECTION RAW WATER COOLING SYSTEM. • INSTALLATION & ERECTION OF SOFTENING PLANT & DISTRIBUTION SYSTEM. • CARRIED OUT TOP-END OVERHAULING OF G-3516 3RC SERIES & 4EK SERIES WET MANIFOLD & DRY MANIFOLD. • CARRIED OUT SEMI MAJOR OVER HAULING OF G-3516 3RC SERIES. (WET MANIFOLD). • CARRIED OUT MAJOR OVERHAULING OF G-3516 4EK SERIES (WET MANIFOLD). • CARRIED OUT MAINTENANCE OF BOTTLE TYPE & L.R.C.H"LIANG- CHI"COOLING TOWERS. • CARRIED OUT MAINTENANCE OF KSB CIRCULATING PUMPS 250.GPM TO 500 GPM AND GEAR PUMP. (FOR OIL TRANSFERRING). CO-GENERATION EXPERIENCE. • INSTALLATION & FABRICATION OF JACKET WATER HEAT RECOVERY SYSTEM. • (OPERATION & MAINTENANCE OF THREE WAY MOTRISE ACTUATOR VALVE +BARBER COLMAN MODULE 8000) • INSTALLATION & FABRICATION OF WASTE HEAT RECOVER SYSTEM • OPERATION & MAINTENANCE OF L.G HOT WATER SINGLE EFFECT ABSORPTION CHILLER MODEL # LWM-W027 CAPACITY 2 X150 U.S.R.T.

Aerospace Engineer

About Me

Industry:

Engineering & Architecture

Occupation:

Aerospace Engineer
 

Education level:

Bachelor

Will Relocate:

Yes

Keywords