CV, Curriculum Vitae and Online Resumes Search

Recruiters - Try Postings!

Postings.com™ is a must-have for recruiters who want to:

  • Find Qualified Candidates
  • Find Job orders and Post Splits
  • Be Found in Search Engines
  • Implement a Social Sourcing Strategy
30-Day Free Trial!



Job Seekers - Look Here!

Hitting a wall with your job search? Try Climber Premium.

  • Top the Search Engines
  • Unsurpassed Candidate Marketing
  • Power Career Networking
  • Fresh Jobs from the Net

Were you looking for excavation job results?
Click Here to search for excavation in our 2.4M jobs.



Online Resumes with "excavation"



Plant Manager - 20 Years of Experience

Ideal Companies: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: Slobodan Vukovic APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: Slobodan Vukovic Slobodan Vukovic Slobodan Vukovic

Tags for this Online Resume: Construction, Consulting, Water Supply, Transportation, Water Treatment, Bridges, Rehabilitation, Architectural, Project Management, Project Manager

Construction Trade Worker Manager

Tags for this Online Resume: Bridges, Budgeting, Computer Literate, Construction, Engineering, Management, Microsoft, Microsoft Excel, Microsoft Project, Microsoft Word

Operating Engineer - 20 Years of Experience - Near 47905

Tags for this Online Resume: Complaints, Inventory, Soldering, Transmissions, Welding, Collection, Government, Training

Featured Profile

Civil Engineer - 8 Years of Experience - Near 76549

SUMMARY Project Manager with 8 years experience working in the construction industry. I have achieved business goals. All of my projects were successfully completed within in budget. I am a hard work and self-motivated, yet proactive.

Ideal Companies: 2 months -

Tags for this Online Resume: Project Management, Construction, Budgeting, Management, Quality, Quality Assurance, Design and construct, Value engineering, scheduling and schedule management, Clear communications, written and verbal, constructibility review, detail oriented, storm water management

Construction & Building Inspector - 20 Years of Experience - Near 55109

Tags for this Online Resume: Install, HP, Construction, Utilities, Accenture FOUNDATION, Management, sheets, Software

Customer Service Manager

Tags for this Online Resume: Scheduling

Featured Profile

Construction Specialist, Restoration Specialist, Mitigation Specialist, Construction Professional, Multifamily Specialist

To assist in the growth of a company that appreciates my efforts, which in turn will change the future of the company as well as the future for my family. To use my personal and professional skills to create primary demand for the products and services we provide. To increase market penetration through superior customer service, goal-oriented salesmanship and prove my worth by being the best I can be at any given task.

Ideal Companies: Cortland Partners, Cushman Wakefield, Lincoln Properties

Tags for this Online Resume: Investment Opportunities, Retail, Services, Professional Services, Sales, Insurance, Documentation, Fraud, Restoration, Estimator, Multifamily, Commercial Building, General Manager, Large Loss, Residential Construction, Development, Roofing

Featured Profile

Environmental, Health & Safety Manager - 6 Years of Experience - Near 91945

As a passionate Health and Safety professional with experience delivering results in a wide-variety of environments, I read you’re posting for the Safety Officer position with great interest. My experience directly aligns with the qualifications you are seeking, and I am confident that I would be a valuable addition to Safety & Environmental Health Division. With over 6 years of successful leadership in occupational saf...

Ideal Companies: Diamond Environmental Services LP, Shirley Parsons, Steelhead Constructors, Inc, Blattner Energy, Helix Electric, RAL Investment Corporation, Welk Resorts Group, Inc., Cybercoders, BBSI, American Water, T.B. Penick & Sons, Inc., FDRsafety, LLC, Morgan Corporation, Acuative, BHI Energy, Professional Tank Cleaning, Inc., Rick Engineering Company, Icon Building Supplies, Hal Hays Construction, Inc, 3 months

Tags for this Online Resume: Management, Program Manager, Risk Assessment, Strong Work Ethic, Hazard Risk Assessment, Training, OSHA, Cal OSHA), Job Safety Analysis, Emergency Management, Facility Inspections, First Aid Kits Inspections, Field Investigations, Fall Protection, Confined Space Entry, Hazmat Handler, Accident Review Committee (ARC) Chairperson, Injury and Illness Prevention Program (IIPP)

Operating Engineer

Tags for this Online Resume: ESA, Documentation, Protocol, Project Management, Project Manager, Drafting, HR, Human Resources, Management, Occupational Safety and Health Act

Excavating Machine Operator - 0 Years of Experience

Construction Laborer

Facilities Manager - 15 Years of Experience - Near 06825

Tags for this Online Resume: Flooring, Switches, Complaints, Construction, Scheduling, HVAC, Install, Management, MIG, MIG Weld