CV, Curriculum Vitae and Online Resumes Search
Recruiters - Try Postings!
Postings.com™ is a must-have for recruiters who want to:
- Find Qualified Candidates
- Find Job orders and Post Splits
- Be Found in Search Engines
- Implement a Social Sourcing Strategy
Job Seekers - Look Here!
Hitting a wall with your job search? Try Climber Premium.
- Top the Search Engines
- Unsurpassed Candidate Marketing
- Power Career Networking
- Fresh Jobs from the Net
Were you looking for Ureki-Georgia- job results?
Click Here to search for Ureki-Georgia- in our 2.4M jobs.
Online Resumes with "Ureki Georgia "
Plant Manager - 20 Years of Experience
Ideal Companies: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: Slobodan Vukovic APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: Slobodan Vukovic Slobodan Vukovic Slobodan Vukovic
Tags for this Online Resume: Construction, Consulting, Water Supply, Transportation, Water Treatment, Bridges, Rehabilitation, Architectural, Project Management, Project Manager