CV, Curriculum Vitae and Online Resumes Search
Recruiters - Try Postings!
Postings.com™ is a must-have for recruiters who want to:
- Find Qualified Candidates
- Find Job orders and Post Splits
- Be Found in Search Engines
- Implement a Social Sourcing Strategy
Job Seekers - Look Here!
Hitting a wall with your job search? Try Climber Premium.
- Top the Search Engines
- Unsurpassed Candidate Marketing
- Power Career Networking
- Fresh Jobs from the Net
Were you looking for treatment-plant job results?
Click Here to search for treatment-plant in our 2.4M jobs.
Online Resumes with "treatment plant"
Plant Manager - 20 Years of Experience
Ideal Companies: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: Slobodan Vukovic APPLICATION LETTER From: Slobodan Vukovic E-mail: vukovicslobodan@gmail.com, Skype: vukovicslobodan Mobil: +38164 4945700 or +381 60 705 85 75 ; +381 64 4945 700 Dear Lady/ Gentlemen, I am a graduated Civil Engineer (Master degree in Organization and Technology in Construction) with more than 35 years� experience, working on large infrastructure projects as Project Manager in Construction 11 years. I believe that I am the person who suits you, due to my experience as a general contractor on large Multi-phased projects each value more than 100 million USD in total revenue size, as well as large earthworks project (Filled Dam �Badush I� contains 24 million cubic meters of filling material, and excavation of over 12 million cubic meters of materials). I have theoretical knowledge and practical experience in many areas of Civil Engineering, which can be seen in my enclosed CV. All projects which I managed, mentioned in my CV are successfully completed as per budget and programmed. The Projects which I was managing are executed mainly overseas in remote location and were successfully completed. My responsibilities in the jobs were: I was organizing the team and perform all contractual obligations in the price and the deadline. Apply Quality control measure on site, Apply Health and safety measure on site. Control: Material and Equipment procurement. I was monitoring and control of material consumption and regular and timely procurement of materials and control of costs. Languages :( writing and reporting skills on the following languages):English, Serbian (mother language), Croatian, Bosnian, Montenegrin French (Faintly) and Russian (Faintly) I am very familiar in applying of contract FIDIC. (FIDIC condition of contract I used on the projects over than 15 years), beside FIDIC I have got experience in different way of Contract as at the last project which I completed was Asian Development Bank (ADB). In my long successfully career I was in list of the key personnel as: - Consulting Engineer, (for a 10 years) Marine works Construction of Synchronic lift �Izmir, Turkey, Mosul Dam Construction near Mosul in Iraq, Flood regulation of the rivers Sava & Danube in Belgrade, Serbia Managing Director (for a 9, 5 years) of International Construction Company (NECO- Nigerian Engineering and Construction Company- Nigeria) in Kano- Nigeria. -Project Manager (for a 11 years) for Construction of different projects Waste Water Treatment Plants (Shkodra-Albania, Bihac- Brosna and Herzegovina, Ureki-Georgia), Sea Port (Misurata -Libya), Sewerage system, Water supply Network (Albania, Brosna and Herzegovina, also Libya and Georgia) - Construction Manager (for a 12, 5 years) for construction of large projects (Jetty- Khoms, Libya; See Port with all infrastructure for the large commercial port in Misurata, Libya; Dam on the river Tigris-Mosul, Iraq, Bridge-Gazela in Belgrade, Serbia). Let me mention some projects on which I was responsible and I was completed them successfully, as follows: - Waste Water Treatment Plants (Albania, Bosnia and Herzegovina, Georgia) (Projects value 20 million USD) -Unloading Crude Oil Jetty, long 1500m founded on the piles in the Mediterranean Sea. (My position: Construction Manager) (Projects value 45 million USD) - Yacht Jetty at �Porte Montenegro� which founded on piles -Tivat, Montenegro (My position: Construction Manager) (Projects value 15 million USD) -Large Commercial Sea port.Misurata , Libya , (My position: Construction Manager) (Projects value: 250 million USD) -New Synchronic lift is founded on piles Tivat, Montenegro (My position: Construction Manager) (Projects value 25 million USD) -Extension of Shipyard and Construction of New Synchronic lift, lifting capacity of: 10 000 tone in Karshijaka-Izmir, Turkey. Synchronic lift structure was founded on 10000Piles (Reinforced concrete and Case piles) (My position: Consulting Engineer). (Projects value: 800 million USD) - �Badush I� Dam Construction, Mosul, Iraq. (My position: Consulting Engineer) (Project value: 1 500 million USD) - Construction of four parallel lines of the underwater pipeline of the inner diameter of 3000 mm in the Mediterranean Sea. (Job contains:Production and laying of reinforce concrete pipeline into the channel 10-15 meter below the seabed) Khoms. Libya (My position: Construction Manager) (Project Value 12 million USD) -Concrete Bridges (Design and Construction) is founded on piles in Kano, Nigeria, (Project value: 7, 5 million USD) - Large Steel Bridge over river Sava in Belgrade, Serbia, (My position: Construction Manager) (Project value: 58 million EUR) -Water front and river regulation (Construction) in Belgrade, Serbia; (My position: Construction Manager) (Project value 25 million USD) -Road Concrete paved, and asphalted one (Construction), Misurata, Libya; Kano, Nigeria (My position: Construction Manager) (Project Value 30 million USD) -Airports (Construction) Skopje, Macedonia Ex-Yugoslavia, & Pristine, Serbia (My position: Construction Manager) (Project value: 70 million USD) - Airport of Run Way (Construction) Kaduna, Nigeria (Project value 12 million USD) - Irrigation System Ibar-Lepenac (Cannal 120 km long and 18 No. of Tunnels Kosovo, Serbia, (My position: Construction Manager ) (Project value: 250 million USD) - Irrigation project- Kano-Nigeria (Project Value 300 million USD), I am free for a new engagement from: May 1, 2018 Best Regards: Slobodan Vukovic Slobodan Vukovic Slobodan Vukovic
Tags for this Online Resume: Construction, Consulting, Water Supply, Transportation, Water Treatment, Bridges, Rehabilitation, Architectural, Project Management, Project Manager
Waste Treatment Plant Operator - 18 Years of Experience - Near 90043
Tags for this Online Resume: Blue Prints, Blueprints, Fabrication, Hydraulics, Micrometers, sheets, Troubleshooting, Valves, Electronics
Water Treatment Plant Operator - 15 Years of Experience
Tags for this Online Resume: Arabic Language, Publishing, Spring
Waste Treatment Plant Operator
Highly motivated and experienced Leader with expert proficiency in Design, Construction, and Management of mega- projects in challenging environments.
A talented Engineer and experienced Manager is seeking Senior or Executive managerial position in a dynamic and multicultural environment.
Ideal Companies: Parsons, WorleyParsons, Atkins, Faithful+Gould, Hill International
Tags for this Online Resume: Procurement, Rehabilitation, Engineering, Training, Design Management, Project Management, Business Management, PMO and Stakeholder Management, Interface Management, Infrastructure, ACAD, EPC and Fast Track Projects, Entrepreneurship, Project Planning and Execution, Business Development and Marketing, General Manager, Risk Management and Mitigation, multi Story buildings, water and waste water, concrete, steel, Seismic
Construction & Building Inspector
Tags for this Online Resume: Construction, Accredited Pension Representative, Dell, Highways, HR, Human Resources, Occupational Safety and Health Act, OSHA
Waste Treatment Plant Operator - 20 Years of Experience - Near 55075
Engineer
Tags for this Online Resume: Control Systems, HVAC, Security, Instrumentation, Utilities, Reliability, View (Db W/Vsam Ims Db2), ADA, Ada Programming Language, Bulk Mail Sorting
Electrical Engineer - 20 Years of Experience - Near 003
of Key Experience Having a successful experience of more than 30 years in the Design, Engineering, Procurement, Construction (EPC), Consulting, Project Management and Maintenance of all Mechanical, Electrical, Piping, Instrumentation, Automation & Control systems related to the multiple engineering projects such as Tunnels, Intelligent Transportation System (ITS), Infrastructure, Bridges, Oil & Gas, Diesel Engine/ Gas Turb...
Tags for this Online Resume: Infrastructure, Automation, Instrumentation, Consulting, Utilities, Control Systems, Project Management, Project Manager, Test, Services
Water Treatment Plant Operator
Tags for this Online Resume: Drywall, Landscaping, Microsoft Windows, Forklift, Construction, Swing, Switches
Engineering Manager - 20 Years of Experience - Near 84104
Tags for this Online Resume: Manufacturing, Mining, Water Treatment, Fabrication, Project Scheduling, Scheduling, Chemistry, Instrumentation, Packaging, Quality