Rss

luis i

Chemical Equipment Operator - 20 Years of Experience - Near 75218

Occupation:

Operations Manager

Education Level:

Bachelor

Will Relocate:

YES

CollapseDescription

SUMMARY I possess over 38 years of experience in the downstream sector of the oil and gas industry. Seasoned Professional with wide experience in management, with national and international organizations. Creative problem solver with ability to drive working team members to execution commitment. High Background as process engineer, design engineer, Project and Engineering Manager, operation supervisor and Operation Manager, for Refinery process, Tank Farm and crude blending for delivery, also Gas Processing Cryogenic plants, including, gas treating, cryogenic Temperatures liquids recovery (C3+) and Gas Methane Liquation (LNG), Liquids fractionation, storage and delivery( TANK FARM AREA), sales of Gas. Also as Commissioning and start up Manager. Knowledge of General Specs (OPERCOM Methodology) and Commissioning Control Software called ICAPS belong to TOTAL Oil&Gas French Company. This Methodology has allowed me be involved in piping, Process, UTILITIES AND OFFSITES, and Storage areas (TANK FARM) Commissioning/START UP and NORMAL OPERATIONS with successful results during my careers. Proficient Professional with high experience in oil Refineries, in process as Crude dehydration atmospheric distillation, Tank FARM storage, blending for cargo preparation on line for tank or Ship, Catalytic Cracking, Alkylation, LPG. Also in Petrochemical Process, like polyethylene and propylene plants. Also experience in Gas Processing plants, treating, pipeline, compression transmission, liquids recovery, storage and deliveries by truck, pipe and SHIPS. Experience include LNG projects design in Venezuela (Conceptual and Basic Engineering), and the biggest LNG trains (2) in Qatar (Raslaffan Industrial area) 8 MM Tons/year per train. Also as LNG consultant in Bolivia to monitor Engineering, Construction, Precommissioning, commissioning, start up and performance test for a new YPFB Plant. This include work with Cryogenic Process Through Expander, Cold Box, and 3 refrigeration levels, getting temperatures from - 45 F up to - 161 C for obtain NGL and LNG. Design for underground Gas piping through long distance public spaces, underground pipe laying under international and national specs, piping protection and coating, right of way, rules for routing, piping security strip, remote valve station and supervision, etc. Solid background in planning coordination and execution of multidisciplinary facilities projects, field engineering, construction coordination, contract administrations, specifications and bids packages preparation and evaluation. includes Process Engineering Plant Operation Design Project Manager Construction coordination Commissioning and Start up Project and Training Manager specialized in natural gas. I'm knowledgeable about process engineering health safety and the environment. Also I have experience in DCS-Honeywell Package to Process Plant Control. I'm proficient in enhancing productivity levels and introducing process improvements. My main achievement during my career is making "NO ACCIDENT" my first priority. Other achievements bring deliveries and milestones on time or before thus saving project cost and getting production in advance. CAREER HIGHLIGHTS * Engineering Manager for new businesses (1999-2003). Reviewed Gas field developments in Anaco and Punta de Mata (Venezuela) for the design of new Fractionation and Extraction plants. Conducted technical- economical analysis (Gas, VAN, TIR). Prepared bidding process for execution of EPCC (ACCROVEN Project). Supervised all EPCC process up to successful start-up of plants in 2002 (800 MMSCFD/ 1500MMUS$ Cryogenic Extraction plant and 50MBD/1000MMUS$ Fractionation Plant). Including TANK FARM area for different HC Liquids on volume between 1.5 and 2 Million Barrels. * Analyzed new development to Furreal and Pirital field Gas reserves. Prepared all required bidding specifications for new extraction (1000MMSCFD) and fractionation (100MBD) plants. * Involved in Design criteria and basis for LNG project, conceptual and Basic engineering, in Venezuela, related to technology, plant location, feed and markets. Execution of FEED. * Involved as Responsible in monitoring as specialist consulter, in engineering, construction, commissioning, start-up and LNG project and hand Over of the project to the client YPFB in Bolivia. * Design revision and approval, right of way completion, to start up 300 Km 30" NGL underground pipeline Between extraction and fractionation plants. Successful achievement. * Safety Manager. Lowest Safety Incidents Award two years in a row (1998, 1999) in PDVSA Gas. No accidents due to excellent preventive strategies implemented. Operations included a gas pipeline network (5000 Km) and gas plants (1800 MMSCFD, 130 MBD) with over 5,000 workers. * Start-up Manager and Operation Manager for the Santa Barbara Extraction Plant 1991 - 1996 Reached $7MM advanced profit on commissioning and start-up through the use of construction strategies in parallel with commissioning activities. Obtained 1.4 million of LNG production in advance. Successful achievement for accomplishment of production and Budget plans every year, including Investment plan execution. * Preparation and execution of safety procedures and training requirements for operators and engineers. Developed operations, commissioning, training, and start-up books. Result success plants start up. * Preparations of first time GLP load procedures for GLP facilities( including off site and TANK FARM) to receive storage and delivery by bottles and trucks. Lead in commissioning and start up activities in ECUADOR (Guayaquil-Monteverde) DESIGN EXPERIENCE * FEED Revision. Execution, revision and approval of engineering detailed drawings. Design of underground, aboveground, Piping and routing calculations. Equipment calculations (fractionation towers, vessels, compressors, exchangers, pumps, TANKS, flare and network release including blow down, others), instrument control loops improve recommendations for the Jose fractionation plant (100 MBD of NGL, 2.5 MMUS$) and Santa Barbara extraction plant (50 MBD of NGL, 800 MMSCFD, 2MMMUS$). PDVSA-Venezuela. * Revision and approval of engineering detailed drawings, equipment design and control loops for commissioning test and startup in a Gas recovery plant (150 MMSCFD/ 10 MBD condensate/ 600 MMUS$). ARAMCO-KOC in Abudhabi. * Calculations and developed engineering detailed drawings for Tecnicas Reunidas EPC. ADNOC project in Abudhabi. Polyethylene and Polypropylene plants (2MMTY and 4MMTY/ 3MMUS$). * Design criteria, engineering detail and calculations revision in a LNG plant (8 MMTY/ 5MMUS$) for Qatar Gas in Qatar. Improvement in rotating equipment loops to facilitate precommissioning, commissioning and start up activities. * Experience from conceptual engineering up to detail engineering, including pipe line routing, layout, plot plan and required safety area of the facility. for the design of new Fractionation and Extraction plants. Conducted technical- economical analysis (Gas VAN TIR). Prepared bidding process for execution of EPCC (ACCROVEN Project). Supervised all EPCC process up to successful start-up of plants in 2002 (800 MMSCFD/ 1500MMUS$ Cryogenic Extraction plant and 50MBD/1000MMUS$ Fractionation Plant). Including TANK FARM area for different HC Liquids on volume between 1.5 and 2 Million Barrels. * Analyzed new development to Furreal and Pirital field Gas reserves. Prepared all required bidding specifications for new extraction (1000MMSCFD) and fractionation (100MBD) plants. Involved in Design criteria and basis for LNG project conceptual and Basic engineering in Venezuela related to technology plant location feed and markets. Execution of FEED. Involved as Responsible in monitoring as specialist consulter in engineering construction commissioning start-up and LNG project and hand Over of the project to the client YPFB in Bolivia. Design revision and approval right of way completion to start up 300 Km 30" NGL underground pipeline Between extraction and fractionation plants. Successful achievement. * Safety Manager. Lowest Safety Incidents Award two years in a row (1998 1999) in PDVSA Gas. No accidents due to excellent preventive strategies implemented. Operations included a gas pipeline network (5000 Km) and gas plants (1800 MMSCFD 130 MBD) with over 5,000 workers.

Right_template4_bottom

CollapseWork Experience

Right_template4_bottom

CollapseEducation

SCHOOL MAJOR YEAR DEGREE

not provided Handling and Organizational Control 2001 Master Degree
Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom