Description
Profile * Project Specialist with FEMA for "Hurricane Sandy" damaged Public School Buildings' Recovery Project. * As Project Engineer: Supervision of International EPC contractor's (Toyo Eng. Of Japan, Stone & Webster of UK, Hyundai of Korea etc.) * Inspection of HVAC System installation which include Air Conditioning Units, Dry Coolers, Air & Water Cooled Condensers, Cooling Towers, Chillers, H&V Units, Steam pressure reducing station, Plumbing and fire protection system under in Waste Water Pumping Water Renovation Project.. * Inspection of underground and above ground Piping, Pumps, Compressors, Bar Screen according to specification & shop drawing. * Mechanical Inspection for condition assessment of NYC Public School Buildings' (BCAS Project) HVAC Systems, Heating Plants, Plumbing and Fire protection system. * Maintenance of Urea Fertilizer complex consisting of Heat Exchangers, Boilers with cogeneration facilities, Turbines, Compressors, Pumps, High pressure vessels, Heat exchangers, Towers, Water treatment plant, Testing & commissioning * Supervision of erection and installation works for Petrochemical Complex including Pressure Vessels (ASME & API Standard), Heat Exchangers, Boilers, Turbines, Piping and other process equipment