Description
Forensics over the following areas of the Hydrocracker Coker Expansion Project Offsites Piping Design and utilities coordination Firewater System Expansion Sour Water System Modifications Cooling Tower 4 and 5 Assessment and Expansion Coker Control Room High Pressure Gas System Instrument Air High Pressure and Low Pressure Flare Additions engineering of the failed vertical aluminum exchanger. Responsible for determining the failure mode and developing modifications to the system using Caesar to eliminate the overstressed conditions. compressor report on vibration analysis and a system analysis of the eventual limits of the combined compressor performance. Accumulated all design and vendor documents and provided a completed project book intended to satisfy the requirements of CFR 49. Responsible for the design and fabrication drawings of a steam to bottoms heat exchanger. Design and Manufacturing oversight of a Fin Fan cooler constructed by ACE. Third party coordination with Lloyds of London to provide the CE stamp for an American manufactured product. QA/QC services provided Compressor skid QA/QC services provided on AGE manufactured skid. Vessel inspection and certification review of x-rays CE stamp coordination PED certification review and preparing documents for the third party inspector. -, Involved in the P&ID reviews, generation of drawings datasheets and specifications for pumps, vessels, exchangers, fin fan units, and pipe stress analysis. Farmland - API 620 and 650 tanks and connecting piping design. Stress analysis on cast iron pumps and systems. Heat transfer analysis of tanks cost analysis of electric vs. steam heated designs

Accomplishments
Highlights:

Keywords
