Description
Maintenance for COTCO - MA4 Zone for Oil Spill Response preparedness TIER 1,2,3 Drills and Training of local personnel with available Oil Spill Response equipment ready for immediate intervention in case of any Oil Spill noticed around & along the Chad Cameroon pipeline area which covers from Doba Chad - kribi Cameroon Onshore- FPSO (Offshore). Working for Working for HYDRAC Cameroon during the construction of structural porch steel roof truss members at the SCHIERNER facility Douala Airport WILLBROSS - SPIE CAPAG Joint Ventures on the 1068 KM 30" crude oil pipeline welding inspection on mainline tie-ins special fabrication repairs valve stations erection etc Working for DOBA LOGISTICS in the pipe and material storage yard Supervision of sand blasting Painting and field coating * Supervision of welding and other engineering works carried out by the company Supervision of welding and other engineering works done by the company