Description
Summary Designed conventional and dual tubing less wells for South Texas Wells. Designed casings string and drill strings for conventional and dual tubing less wells. Designed cementing programs and performed daily hydraulics calculations. Designed drilling programs and well planning for oil and HTHP gas wells. Prepared procedures for new well completions and remedial workovers for Austin Chalk etc. Prepared cost estimates and AFE's for completions and recompleted wells. Supervised workovers .and analyzed logs for possible recompletion. Worked with facility engineering group to optimize field facilities. Performed and optimized wells with the use of logs, decline curves and volumetric calculations.
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
Bp | Senior Well Intervention Engineer/Senior Production Engineer | 1/2005 - 1/2015 |