Description
The Facilitated forklift operations to load and unload 18 wheeled trailers with automobile parts for Ford and GM facilities for vehicles assembly and other tasks as assigned. FDF Towers/ Glass wire: OSP Project Manager installation of underground fiber and Ariel Fiber to enable the use of fiber to the customer premises. Read the blue print and co-ordinate the coring and Ariel teams to complete the project to att specifications safely and within deadline parameters. Also Telecommute Duties: CISCO GSM over Ethernet Migration Project Single Point of contact on end to end management of assigned projects, completing projects within allotted timeline and budget. Clarified and developed project scope, detailed work plans, schedules, objectives, estimates coordinates activities of the project team, identifying resources and implementation strategy. Collaborated across multiple functions to ensure adherences to quality standards, internal processes, reviews project deliverables. Provided overall direction and technical or analytical guidance to project and program teams that typically span multiple organizations, markets and outside Suppliers/vendors. Recommend and took action to direct the analysis and solutions of problems. Strong knowledge of telecommunications network infrastructure Project Management structure and lifecycle, cellular network deployment and cellular network infrastructure. Understanding of Network Equipment/Architecture systems and operations. Strong relationship building and negotiation skills with the ability to recognize and solve problems. Process oriented and be flexible to meet the needs of the business. Provide trouble shooting as needed. Responsible for all documentation including Excel & Granite. Responsible for managing this work on a specific set of sites in a specific geographic area. NEXT-GEN/AT&T Mobility Lead PM / VoLTE /4G was used to create alarms for their RAN signaling to the 3g UMTS/CDMA Antenna arrays from the BTS to the Regional Operation Control Centers can monitor remotely reporting from the BTS/cell to the switch platform located at their R-NOCC. To coordinate the crews for the installation of LTE RAN Equipment for the next phase of 4g equipment. Versed in the Used of a Nortel developed HP UX software called WMS from the Alcatel/ Lucent 7670 switches levels to access the UMTS/CDMA 3g RAN signaling path to the BTS Cell site to turn up and turn down the antenna arrays for the tower crew assign to expand antenna array's for the use of RAN 3g UMTS signaling in a Tri-state area. Versed in the use of the AT&T software use for their ticketing systems to create tickets and specific tickets called EIM's for the crew working the Tri-state area. Converted Sprint's 2g router network up to 3g spec's. Performed nightly change management events with the switch techs for the upgrade of the Cisco 10008K and Juniper M10i & M40e routers on the Sprint Core local area and wide area network. To the switches up to MLPPP standards worked the RNET hotline during the days to help assist the switch techs with new builds and upgrade stragglers sites on the 3g network as well. Acceptance with 3g layer Cells sites. Test head to head with Local Exchange Carriers and be familiar with the 2310 T-bird for manual testing of UMTS/ CDMA RAN technology T1's form the switch side as well. Monitoring the TDMA on 5E Lucent Switch cat five wiring for the True position (E911) equipment. Test the paths of LMU's for the E911. Check the cross connects in the 532L DAC's . Keep accurate records of new UMTS/ CDMA RAN technology installs of the T1 testing platform by use of their CTS ticket management system. Also provision the path for the new UMTS/ CDMA RAN T1's in the Alcatel 1631 & Tellabs DAC's Tellabs 5500 DAC's. Familiar with the 5620 GUI on the 7670 Alcatel Switch also familiar with Centest and Spirent testing software from the switch tech level. Also Scripted Span adds from the Switch to the UMTS / CDMA BTS/ cell site as a switch technician as well for UMTS/ CDMA RAN 3g carrier adds. Primary on the local and wide area network, with the use of Spirent software, (widely known as React) that allows access to the Tellabs DAC's, Alcatel DAC's along with other network equipment from the Lucent and Nortel switch locations remotely. To test with the testers on the local exchange carrier groups for the test and Acceptance of new 2g and 3g EVDO circuits on a new layer of the Sprint 3g WAN as well as the Local area 2g and 3g network at the Switch level. Pitney Bowes Management Services Customer Service Associate duties were to make sure that PBMS customers ( Sprint Employees ) mail is delivered in a timely manner and their supplies are kept up to meet their demanding business needs. Sprint PCS Special Troubleshooting & Testing (Remote Testing Access Center -RTAC) Team. Certified in testing software Hekimian. Responsible for troubleshooting various software platforms such as: SS7 WSCP VMS VAD Tellabs 5500 Alcate1631 DAC's and Hekimian at the NOCC. Responsible for DS1 testing on PCS wireless network. was a key team player in cross training implementation of regional teams at the NOCC. Trained remote switch analyst at remotely accessing the Lucent 5E switches in the NOCC. Also versed in the use of Spirent DS1 Testing software. Assisted in the training of 26 members of my team as well as all NOCC Analysts on a daily basis on the use of remote switch tech testing tools (React testing software). The network Liaison between the NOCC and the Alcatel lucent DAC's and Tellabs DAC's. Created the Service level agreements between the NOCC and the local exchange carriers.