Rss

Contact_user

Shaji P

Electrical Engineer - 14 Years of Experience

Occupation:

Electrical Engineer

Education Level:

Bachelor

Will Relocate:

YES

CollapseDescription

Professional Summary Total industrial experiences : 14years Company : Oman Electricity Transmission Company Designation : Assistant Electrical Maintenance Engineer Period : October 2015 to till date. Job Responsibility: * Maintenance of OETC 220 & 132kV Grid Stations. * Maintenance of OETC 220 & 132kV OHL's. * Attending Emergency & Shutdown activities in Grid Stations as well as in OHL's. * Preparing, maintaining and recording SOP checklists and inspection reports. * Holding PTW and LOA for different types of activities. * Routine inspection and testing of Power Transformers, Earthing Transformers, Breakers, CT's, CVT's, and Surge Arrestors. * Routine inspection and maintenance of 132 & 220kV GIS. * Routine inspection and maintenance of 48 & 110V Battery Charger and Battery Banks. * Maintaining proper HSE requirements in the Grid Station. Company : Oman Electricity Transmission Company Designation : Electrical Protection Technician Period : May 2012 to September 2015. Job Responsibility: * Assisting in trouble shooting and maintenance works with OETC protection engineers. * Holding LOA for different maintenance activities. * Modification and rectification works in relay panels. * Preparing checklists and inspection reports. Company : Ray International LLC Designation : Electrical Supervisor Period : February 2010 to April 2012. Job Responsibility: * Prepare the Shift Log Report * As per the Maintenance Schedule follow up and execute the Maintenance Activities * Attend PDO HSE meeting and solve the issues related with the job. * Prepare the progress report, Weekly report, time sheet. Nature of work: * Ex. Inspection and rectification of PDO asset. * Inputting the Inspected assets details to the system. * Prepare the materials request and required resources for the job. * Rectification of all the Ex. Equipment. SHAFIQ TRADING AND CONTRCTING EST AL-JUBAIL-KSA PERIOD : June 2003 to March 2009 DESIGINATION: Electrical Supervisor PROJECT INVOLVED: * IBN SAHR Petro Chemical Company * SAFCO Fertilizer Company * HADEED Steel Job Responsibility: * Site Job Allocation and Monitor the Work Progress and Reporting to Authority * Prepare the Material Requirement for Site Work and Arranging From the Store * Planning and Estimate the Manpower Requirement for Site work * Prepare and validate the permit for the job * Arranging the QC Inspection and Clearing the Snag Report Nature of work * Erection of 11KV SWGR Panel, 11/433KV Transformer * Installation of Cable Tray, and Laying of Power and Control Cables * Erection of DC Battery Systems, and Commissioning assistance * 11KV Switch Gear, Transformer, Protection Relay Testing And Commissioning Assistance. * Installation Earthing System for Transformer and 11KV SWGR Panel Cable Laying, Glanding and Termination. * Modification of 11kv SWGR Panel - Installation of CT, Bus Bar, Protection and Auxiliary Relays. * Control wiring for 11kv SWGR panel as per the drawing.

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom