Rss

Contact_user

Shujauddin M

Power Generating Plant Operator - 20 Years of Experience - Near 11383

Occupation:

Power Generating Plant Operator

Education Level:

Bachelor

Will Relocate:

YES

CollapseDescription

September 08, 2013 Title Electrical Managerial Post Dear Sir/ Madam This letter is to express my interest in the Electrical Managerial position. Based on my skills After Sale Manager in ABB Power Products Medium Voltage Switchgear Department (PPMV) Saudi Arabia and Project Manager I am confident that I would be a great addition to your team. My resume that highlights my ability/knowledge/expertise is enclosed during my time. I am excited about the any Electrical Managerial position and ability to help your company in succeed. Thank you in advance for your time. Please do not hesitate to contact me if you have any questions. I would appreciate the opportunity to review my qualifications in more detail and will contact you next Sincerely, Shujauddin Munshi After Sales Service Manager ABB Electrical Industrial Co. Ltd. Phone: +966 1 265 3030 Ext.1383 Telefax: +966 1 265 1211 Mobile: 00966 506233432 email: shujauddin.munshi@sa.abb.com ------------------------------------------------------Munshi up-date C.V SHUJAUDDIN MUNSHI CURRICULUM VITAE _________________________________________________________________ ADDRESS ABB ELECTRICAL INDUSTRIES LTD CO. P.O.Box 251, Riyadh 11383, Saudi Arabia. OFFICE CONTACT # 009661-2653030 Ext 1383 RES PHONE # 009661-4642603 MOBILE # 00966506233432 E-MAIL shujauddin.munshi@sa.abb.com Shuja621@hotmail.com ADDRES IN PAKISTAN Banglow # R-29 Block # 13D/1 KDA Scheme # 24 Gulshan-e-Iqbal Karachi Pakistan RES PHONE # 0092213-7630571, 0092213-7630571 CAREER OBJECTIVE To be part of a growth oriented organization where I can apply my technical managerial knowledge and gained experience at various academic and professional places to mutually benefit for organization and for self. WORK EXPERRIENCE IN FOREIGN COUNTRIES. 1) ABB ELECTRICAL INDUSTRIES LTD COMPANY. RIYADH SAUDI ARABIA. 2) MC-DERMOTT AMERICAN “ON SHORE” “OFF SHORE” COMPANY DUBAI. ________________________________________________________________________________ PROFESSIONAL EXPERIENCE SUMMARY IN ABB ELECTRICAL INDUSTRIES SAUDI ARABIA • Presently I am working as After Sale Manager for Medium Voltage Power Products with (ABB Electrical Industries Company Ltd Saudi Arabia) • Promoted as Senior Project Engineer for Medium Voltage Switchgear Engineering.(ABB Saudi Arabia) in year of January 2007 up- to December 2009 • Promoted as Technical Support and After Sales Service Engineer in year of July 2003 up-to December/2006 • I have join as Testing/Commissioning of Electrical Power Products , Protection Relays & Control. In ABB Electrical Industries Company Ltd Saudi Arabia from 16 June/1994 up-to 2003 PROFESSIONAL WORK EXPERIENCE WITH ABB ELECTRICAL INDUSTRIES LTD., RIYADH, SAUDI ARABIA January '2010 – till to Date A) AFTER SALE MANAGER IN POWER PRODUCTS MEDIUM VOLATGE DEPARTMENT Promoted as After Sale Manager in Power Products Medium Voltage Department & Medium Voltage Switchgear Power Technology Department ABB Electrical Industries Ltd., Riyadh Saudi Arabia Branch. (http://www.abb.com) Technical Role and Responsibilities: • After Sales Customer Technical Support with the Medium Voltage Power Products. • Projects site comments to attend by assigning the within the department’s Technician & Engineers. • Corresponding with ABB venders & suppliers for technical clarification of the Medium Voltage Products. • Customer record in CCRP (Customer Complaints Resolution Process) data base for Medium Voltage Products warrantee period. ABB ELECTRICAL INDUSTRIES LTD., RIYADH, SAUDI ARABIA January '2007 – up to- December 2009 B) SENIOR PROJECT ENGINEER IN POWER PRODUCTS MEDIUM VOLATGE DEPARTMENT I have worked as Senior Project Engineer in the Medium Voltage Switchgear Power Technology Department of ABB Electrical Industries Ltd., Riyadh Saudi Arabia Branch. I have ABB PMP Certification. (http://www.abb.com) Technical Role and Responsibilities: • After the receiving the project documents from front & Sales, study the projects terms & condition, coordinate with proposal & design as well as supply management. • Corresponding with vender suppliers for technical clarification of the products. • Project execution as per project specification and contractual terms and conditions. • Keeping the close coordination between all concerned of the project either side. • Project budget control in all aspect in order to maintain the profitability. ABB ELECTRICAL INDUSTRIES LTD., RIYADH, SAUDI ARABIA July '2003 – December ‘2006 C) CUSTOMER TECHNICAL SUPPORT AND AFTER SALES SERVICE ENGINEER I have worked in the capacity of Customer Technical Support and After Sales Service Engineer in the Medium Voltage Switchgear Power Technology Department of ABB Electrical Industries Ltd., Riyadh Saudi Arabia Branch. (http://www.abb.com). Technical Role and Responsibilities: • After Sales Customer Technical Support. • Projects site comments to attend by assigning the within the department’s Technician & Engineers. • Corresponding with vender suppliers for technical clarification of the products. Handled & Managed Various Projects I have handled & managed various projects for site Testing & Pre-Commissioning activity carried out with the professionals’ team site Technician, Supervisors, and Commissioning Engineers. Worked with yearly budget of 30 million Saudi-Riyals for site Testing & Pre-Commissioning projects. The various projects were commissioned and handle as listed below. A) Shoaiba Power Plant: Jubail, Saudi Arabia. B) Quaiza 132kV/13.8kV sub-station: Jeddah, Saudi Arabia. C) Hail Water Treatment Plant: Hail, Saudi Arabia. D) Saudi Aramco Desalination Plant Harad: Harad, Saudi Arabia. E) Petro Kemiya Plant: Sabic Jubail, Saudi Arabia. F) Various Saudi Electricity projects handled: Riyadh Central region, Dammam Eastern region, Jeddah Western region G) J.RAY Mc-DERMOTT: ON Shore/ OFF Shore oil field Jebel Ali Dubai. Responsibility I was responsible for site Testing & Pre-Commissioning activity, co-ordination with the customer for site witnessed, organizing the site commissioning schedule, clearing the customer comments, and final commissioning acceptance test. Reported to After the commissioned the projects, all the projects site report customer acceptance certificates are handing over to Field Commissioning Manager. I held this position until July 30, 2003. ABB ELECTRICAL INDUSTRIES LTD., RIYADH, SAUDI ARABIA June '1994 – June 2003 D)TESTING and COMMISSIONING ENGINEER IN POWER PRODUCTS MEDIUM VOLATGE DEPARTMENT I have worked in the capacity of Testing and Commissioning Engineer for Power Products Medium Voltage Switchgear Department in the ABB Electrical Industries Ltd., Riyadh Saudi Arabia Branch. (http://www.abb.com). Technical Role and Responsibilities: • Testing & Commissioning of 13.8kV/33kVSwitchgear. • Work involved testing of typical control and protection circuits. • Power Frequency test, insulation test. • Testing of Network Protection and control scheme. • Testing of various electrical components used in the switchgear. • Testing of LV switchgear, Ring Main Units, Compact Substations. • Mobile Substation with capacity 5, 10, 20MVA 69kV/13.8kV. • Trouble shooting during erection, Testing & Commissioning of various projects. • Customer Inspection and Type Test witnessing. • Preparation and study the test results as per IEC regulation. • Quality Control check according to QA regulation for Metering, Control and Protection. Components used in switchgears. • Testing & Commissioning of substation 13.8kV/0.480kV • 33kV/13.8kV. SHEBBA MARINE PANAMA MV SHIP DUKE OF SA Oct, 1992 20-03-1994 E) ELECTRICAL ENGINEER Technical Role and Responsibilities: • Marine navigation equipments. • Low Voltage Motor Control and AC/DC Distribution systems. • Generator Protection relays, Synchronizing unit, Load control and • Load sharing systems. • DC Control Devices for DC Motors. MC DERMOTT DUBAI AMERICAN ON SHORE OFFSHORE COMPANY Jan 1992 – Aug 1992 F) ELECTRICAL SUPERVISOR Technical Role and Responsibilities: • Installation & commissioning ON SHORE OFF SHORE • Substation’s Electrical work. ANSALDO ITALIAN COMPANY (PAKISTAN K.E.S.C. BIN QASIM THARMAL POWER STATION 210 MW TWO UINTS) April 1989- Feb 1991 G) ELECTRICAL COMMISSIONING SUPERVISOR Technical Role and Responsibilities: Electrical Commissioning Supervisor Commissioned following systems. 1. H&B Logic Control system. 2. GSX5C Generator Protection system by ABB. 3. M.N.S. Change over system by ABB. 4. Cathodic Protection system by Wilson Walton. 5. 6.6KV Switchgears system by Magrini Italia 6. Power Control & Motor Control Center by BBC Italia. 7. Protection Relays. 8. Hydrogen generation plant. 9. DC System of 24V, 48V, and 220V. 10. 220 KV, SF6 Switchgears auxiliary and Control. System by HITACHI JAPAN. SIEMENS PAKISTAN ENGINEERING COMPANY Jan 1986 – Aug 1989 H) ELECTRICAL SUPERVISOR Technical Role and Responsibilities: I have worked on various Projects with Siemens Pakistan in capacity of Electrical Supervisor following are the project brief description. h.1) GAS TURBINE POWER STATION 100 X 2 MW KOT ADDU Commissioning of 6.6 KV Switchgear. Commissioning of Generator Protection Relays by Siemens Germany. h.2) BELA CHEMICAL INDUSTRIES WINDER BALUCHITAN Commissioning of 6.6 KV Switchgear by Siemens Germany. h.3) SIEMENS PAKISTAN SITE KARACHI HIGH VOLTAGE TEST FIELD LAB Commissioning of High Voltage test field for Power Transformer High Voltage Test up to 400 KV Impulse Generator Test up to 1200 KV Indus Voltage Test. EDUCATION & PROFESSIONAL QUALIFICATIONS Electrical Engineer Degree. PROFESSIONAL TRAINING: TECHNICAL SEMENARS AND COURESES A) I have attended 1 day Seminar for AVO International In Electrical Test & Measuring Equipments. B) 5 Days Training course in Protective Relays Application from ACTRAIN The course was content as listed below. • Phases and polarity. • Short Circuit Review. • Relay Coordination Basics. • Basic Circuit Arrangement and Relay types. • Current and Potential Transformers. • Grounding and Symmetrical components. • Feeder Protection. • Transformer Protection. • Motor Protection. • Generator Protection. • Plant Utility Tie Circuit Protection. • Bus Bar Protection. • Capacitor Protection. • Time Current Characteristic Curves. C) I have taken 2 days course in Technical Report Writing from MCE. D) 4 Days Training Course for Programming and Configuration of REF 542 Relay Instructors from ABB Germany. E) 5 Days Training Program in Power System Protection by ABB University Switzerland. The course was content as listed below. • Fault and disturbances. • Requirements for Protection and Substation. • Automation. • Current and Voltage Transformers. • Line Protection. • Bus Bar Protection. • Generator Protection. • Products. • Motor Protection. PROTECTION RELAYS The following listed ABB Protection relays tested during Testing/Commissioning period. 1) Transformer Diff. relays : RADSB, SPAD330 2) Bus bar Differential relays : RADHA, RADSS 3) Over current relay : RACID, MCGG, SPAJ140 4) Auto reclosuer relay : REXA103, RACIB 5) Directional relay : REL010, RXPE, and METI 6) Breaker failure relay : RAICA, RAICC, and MCTI 7) Pilot wire protection. Relay : H04, MBCI 8) Motor protection relay : SPAM150 9) Under voltage relay : SPAU130 10) Annunciator : SACO16.3D The below listed equipments were handled during the site Substation’s Commissioning works. A. Secondary Injection Relays and Metering Components Testing Sets. B. Injection test sets, Severker 750/650. C. Freja R.T.S.11, R.T.S.21, R.T.S.300 Computerized secondary Current & Voltage Injection Testing sets. D. Power & Control Test bench. E. Meg Curve Test set F. Circuit Breaker Timing Test set (Programa) G. The Primary Testing Equipments Power frequency test set. 2kV.Test set, Peak Voltmeter set. Primary Current Injection Test set. Contact Resistance Test set. Shujauddin Munshi After Sales Service Manager ABB Electrical Industrial Co. Ltd. Phone: +966 1 265 3030 Ext.1383 Telefax: +966 1 265 1211 Mobile: 00966 506233432 email: shujauddin.munshi@sa.abb.com

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom