Description
Summary Sr. Radiological Control Technician Depleted UraniumEmergency Squad Member SNM, HEU CH, RH TRU Waste Accountable Shift Supervisor Supervisor Medical Isotopes James A. Fitzpatrick Jan. 11, 2017 - Jan. 25, 2017 Sr. Radiological Control Technician Provided job coverage for the Turbine Deck, removal of turbine fans, set up CA boundaries, MSRV work, Airborne samples, radiation/contamination surveys, personell decon and free release of items. Farley Nuclear Plant Sept. 19, 2016-Oct. 26, 2016 Sr. Radiological Control Technician Provided job coverage in the Auxilary bldg., covered filter change out, radiological/ contamination surveys, airborne surveys Grand Gulf Feb. 09, 2016-Mar. 2016 Sr. Radiological Control Technician Performed job coverage for U/V (under vessel), radiological surveys for dose, continuous job coverage for LHRA VogtleSept. 08, 2015 - Oct. 12, 2015 Sr. Radiological Control Technician Technician on special project for the replacement of the entire refueling bridge. Provided coverage for the work crews replacing the bridge, performed air samples, radiological/ contamination surveys, wrote survey data utilizing VSDS program. Hope Creek April 03, 2015 05/02/2015 Sr. Radiological Control Technician Job coverage for Refuel floor, performed radiological/contamination surveys, airborne, tritium, noble gas samples, deconned personnel. Covered movement of LRPM's, spent fuel, helped train Jr. RP techs. Wolf Creek January 26, 2015 April 01, 2015 Sr. Radiological Control Technician Job Coverage, performed Radiological/Contamination and Airborne Surveys. Performed duties at Access Control Point, Deconned Personnel. Performed duties on Refuel floor. Covered work in fuel pool and spent fuel pool, covered incore thimble cutting. Valve job coverage. Point Beach September 15, 2014-October 24, 2014 Sr. Radiological Control Technician Performed duties in the Auxiliary Bldg. Performed Radiological/Contamination surveys, job coverage. Worked Control Desk, Spent Fuel Pool coverage, containment building coverage. Pipeway 2 valve job coverage, ECHO 1 duties. Hope Creek Power Plant October 05, 2013- November 22, 2013 S r. Radiological Control Technician Performed duties in Turbine Bldg., Radiological/Contamination Surveys, Set up CA, HCA boundaries, Free release of tools and materials, Valve job coverage, down posting survey task`s, surveys. Took and passed the NUF exam. (10/10/2013) Vermont Yankee March 05, 2013-March 22, 2013 Sr. Radiological Control Technician Performed radiological/contamination surveys, performed HRA and LHRA pre-job briefs, manned Rx building control point, performed duties in the RMS trailer (remote monitoring), worked on the refuel floor, drywell and turbine bldg. Grand Gulf Power PlantNov.19, 2012-Nov.23, 2012 Sr. Radiological Control Technician Control Point, Provided job coverage for valve work, free release surveys, deconned personnel. Cooper Nuclear Power Station Sept. 04, 2012 - Nov 2012 Sr. Radiological Control Technician Worked Access Control, job coverage of DryWell removal and installation of Fan Coil units for alpha, bravo, charlie and delta units utilizing Qtrack remote monitoring and telex communication system, also Vocera communication program, pre-job briefs, High Radiation and Locked High Radiation briefs. Also participated in teaching new workers basic radiation protection principles. Covered Turbine Bldg. Utilized remote monitoring for drywell job coverage. Hope Creek Nuclear Plant April 07, 2012-May 02, 2012 Sr. Radiological Control Technician Worked Reactor building at access control, covered valve work, released items from CA's and deconned personnel also provided coverage for work in HIPC and remote monitoring of personnel. Grand Gulf Nuclear PlantFeb.09, 2012 - April 01, 201204 Sr Radiological Control Technician Worked at Access Control monitoring Personnel and materials entering and leaving Containment. Performed deconning of personnel and documenting the PCE's. Comanche Peak Power Plant April 03, 2011-May 05, 2011 Sr. Radiological Control Technician Performed job coverage for the movement of containers, radiological/contamination surveys for material going into and out of containment and offsite. Portsmouth Gaseous Diffusion PlantOct. 18, 2010 - April 01, 2011 Sr. Radiological Control Technician Provided Nuclear Criticality Safety coverage in the storage and transport of Uranium bearing material. Performed characterization surveys and surveys for the transportation of Uranium bearing material to NNSS. Performed Health and Safety duties as well, safety oversight. NASA Plumbrook FacilityMay 11, 2010 - June 30, 2011 Sr. Radiological Control Technician Performed characterization surveys, Gamma Scan walkovers and job coverage for the D & D of the Reactor Facility. Performed air sampling, Health and Safety duties, Adhered to and enforced Industrial Hygiene procedures and codes. Savannah River Nuclear Site Jan. 12, 2010-Mar. 22, 2010 Sr. Radiological Control Inspector Provided job coverage for sampling technicians and radiological surveys for H Tank Farms for the treatment and remediation of High Level Liquid Waste. Turkey Point PlantOct. 19, 2009 - Nov. 20, 2009 Sr. Radiological Control Technician Performed duties at Access Control Point monitoring personnel and items leaving the RCA. Performed radiological/contamination surveys and decontamination of personnel as needed. Palo Verde Nuclear Power PlantSept. 14, 2009 - Nov. 20, 2009 Sr. Radiological Control Technician Performed job coverage for replacement of Reactor Head, radiological/contamination surveys and air samples. DuratekApr. 01, 2009 - May 31, 2009 Sr. Radiological Control Technician Performed radiological/contamination surveys of Sealands for U.S. Navy. Performed Health and Safety duties along with Industrial Hygiene per Standard Procedures, made sure all employees complied with Procedures. Hope Creek Power PlantMar. 21, 2009 - April 30, 2009 Sr. Radiological Control Technician Provided job coverage in VHRA, LHRA, RWP pre-job briefs, radiological/contamination surveys. Worked at Access Control monitoring items and personnel leaving the RCA also performed deconning of personnel if needed. Performed Remote Monitoring job coverage.