Description
Date: From: NOV. 2009 To: Feb. 2014 Company: PETRO FARAYAND ARYA CONSULTING ENGINEERS Place: Tehran, Iran Title: PIPING PSL (project Specialist Leader), PDMS Admin and PDMS catalogue man Major Activities: - Importing catalogue in PDMS for “LAB SEFID GAS GATHERING AND INJECTION” Project. - Lab Sefid project detail design and modeling with PDMS. - Importing catalogue in PDMS for “BIBI-HAKIMEH NEW GAS COMPRESSOR STATION “Project. - Importing catalogue in PDMS for “KUPAL SUPPLEMENTARY GAS INJECTION “Project. - “BANDAR ABBAS GAS CONDENSATE REFINERY “Project Detail design And Modeling with PDMS. - Stress Analysis with CAESAR II and Supporting of Bandar abbas Project (Since Apr. 2012). Date: From: JUL. 2009 To: NOV. 2009 Company: ANDISHEH ZOLAL CONSULTING ENGINEERS Place: Tehran, Iran Title: PIPING DESIGN ENGINEER Major Activities: - Fajr (II) Petrochemical Utility Detail Design and Modeling with PDMS. Date: From: SEP. 2008 To: JUN. 2009 Company: ASIA INSTRUMENTS CO. (ALDERLEY J.V.) Place: MEHRSHAHR, KARAJ, IRAN Title: VICE PRESIDENT OF FACTORY MANAGER Major Activities: - Detail Design and Modeling with PDMS and Construction of PROVER FACTORY (EPC PROJECT). Date: From: JUN. 2007 To: AUG. 2008 Company: CHAGALESH CONSULTING ENGINEERS Place: TEHRAN, IRAN Title: PIPING DESIGN ENGINEER Major Activities: - Detail Design and Modeling with PDMS of Isomerization Unit in Tehran Refinery. Date: From: JUL. 2006 To: JUN. 2007 Company: SHAFA-E- SARI Place: KARAJ, IRAN Title: UTILITY SUPERVISOR AND PIPING INSPECTOR Major Activities: - Utility Equipment Installation, Utility Piping Implementation and Also Pre commissioning and Commissioning of “ERYTHROMYCIN BASE” project. At The End, I’d like to Emphasize Because Of My Individual Interest And Being well skilled , I have good knowledge and abilities in Utility Equipment and Utility Process like ” chiller , compressor , pump , N2package , Boiler , Cooling Tower and RO (Reverse Osmosis Package) “ .