Want your profile here?
Becoming a member is easy!
Climber.com works with you to help you advance your career by putting you directly in front of tens of thousands of recruiters in your field. Sign up today on Climber.com
Recruiters - Try Postings!
Postings.com™ is a must-have for recruiters who want to:
- Find Qualified Candidates
- Find Job orders and Post Splits
- Be Found in Search Engines
- Implement a Social Sourcing Strategy
Project Manager
Experience: List Logistics: (was Part of the Beacon Group)was the WMS specialist....Set up all the controls and managed the wms system in NJ. and MA. Lightec, Inc. : was PM for this Energy Services Company, facility energy auditing,installation and maintenance of the energy efficient equipment and found needed electric utility rebates to lower overall cost. the beacon group : was PM for the jobs listed Boston Food Bank: was the PM on the fit up of all the storage racking for their dry goods,cold storage,and frozen. did layout adjust on the fly to meet clients needs. raymour flanigan: was the pm on site in NJ for three months on the take down of a 1.7 million Sq/ft of racking. pm’d the relocation to 3 new sites and the reinstallation in NY,NJ.and Pa.Did weekly reports to client with updates and photos. Pepsi: was PM for maintenance of 11 Pepsi distribution sites in ME.Ma.Ct.,andRI. Worked with site managers to meet the needs for lawn care,and all maintenance needs meadwestvaco: was consultant for an $80,000 agreement to improve productivity auto pick to pack,warehousing layouts, and hand pick to pack. relocation Project manager : worked with clients to move their companies to a new site. 1.Locate new site 2.design and layout new site, 3.G.C. all work for new offices,warehouse set up and needed production floor needs 4.set up and manage all move logistics 5.do all design and layouts for new IT, Phone, power. Delta education llc Nashua NH Corporate Safety Facility for Delta Education LLC Four sites , in Three states 32,000 sq./ft to 348,000 sq./ft ..300 plus employees) I was also a certified OSHA Trainer and did all safety training. As such the workers compensation MOD was lowered to .84 in the first two years on this job. Project manager for new 88,000 sq/ft.add on As the needs of Delta changed, I was asked to move from Purchasing manage to PM/GC this new construction. Did all bid outs and did all layout and capital purchasing also put in WMS systems and did all layouts for new pick and pack carrousels (12 units lite pick systems) Purchasing manager/Production control group: After the relocation I took over as Purchasing manager and did this for 12 to 18 months relocation Project manager I have PM’d a relocation of three sites to one 259,000 sq./ft, set up and designed all plant layouts, storage racking, production floor, all electric , IT and phone systems. I bid out and managed all equipment(storage racking, fork trucks)and the move into the new site. Worked with GC on punch list, had final approval in all change orders and all payments. I designed all IT and Phone layouts, and purchased all needed equipment Printed circuit cooperation Purchasing manager/Materials manager Control all Purchasing for the high Tech circuit broad Maker (18 to 20 million per year) Education— University of Mass Boston BS ed References upon Request (T 603 204 4995)
Boat Builders & Shipwright
About Me
Industry: |
Construction & Extraction |
---|---|
Occupation: |
Boat Builders & Shipwright |
Education level: |
Bachelor |
Will Relocate: |
Yes |
Location: |
Durham, NC |