Description
Team player with knowledge and successful use of Six Sigma, Lean Manufacturing and Kaizen disciplines and techniques.
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
La Farge Corporation-Gypsum division | (Confidential) | 9/1995 - 8/2007 |
Education
SCHOOL | MAJOR | YEAR | DEGREE |
---|---|---|---|
World Education | Industrial Engineer | 1980 | Bachelor Degree |
Accomplishments
Highlights:
***** Created the lay out plan to duplicate the end line production and save 1.8 million from consulting company proposal. ***** Developed level 5 wallboard that was lunched in the world market on 2007. ***** Increase productivity in 60%, then 15% and leave a proposal to reduce waste and non conformity products with use of Six Sigma. ***** Comply standards gave by UL, Gypsum Association and ASTM. ***** Created quality teams trough personal couching. *** Handled day-to-day operations involving safety, quality and productivity.Companies I like:
No preference
Job Skills
Keywords
Responsibilities
Assured process and quality production trough process change suggestions including raw materials, machinery and man power with use of time motion studies.