Rss

Sergio G

Speedy Gonzalez

Occupation:

Mechanical Engineer

Location:

Westhampton Beach, NY

Education Level:

Bachelor

Will Relocate:

YES

CollapseDescription

Intense and energetical mechanical engineer, independent and self motivated

Right_template4_bottom

CollapseWork Experience

COMPANY POSITION HELD DATES WORKED

(Confidential) (Confidential) 11/2000 - Present
Right_template4_bottom

CollapseEducation

SCHOOL MAJOR YEAR DEGREE

Floirda International University Mechanical Engineer 1987 Bachelor Degree
Right_template4_bottom

CollapseAccomplishments

Highlights:

Sergio R. Gonzalez 3095 N.W. 6th Street Miami, Florida 33125-4215 Telephone: (305) 643-4529 (Evenings) (305) 632-4309 (cell) (305) 543-0918 (beeper) Serg02@msn.com (email) OBJECTIVE: To work for a firm which perform at a professional level, in which I can grow through my work applying my engineering and contracting skills EMPLOYMENT HISTORY: (Nov 2000 to present time) HNTB Corp Miami, Florida Position: Mechanical Engineer II Tasks: Plan review of projects in Miami International Airport North Terminal Development and other miscellaneous design projects. Other tasks are Annual Airport Facilities Inspections and Specialty Inspections at MIA facilities. Some design work for different state and government agencies. Other HNTB offices also as clients. (Jan 2000 to Nov 2000) The Smith Korach Hayet Haynie Partnership Miami, Florida Position: Mechanical Engineer/Mech. Dept. Head Tasks: Southern Bell Telephone Company Group/Air Conditioning Department responsible for HVAC, Plumbing & Fire Sprinklers. Design/Engineering; Institutional, Governmental & Commercial Projects, Utilities were also covered along with project management, field engineering and interaction with clients or prospective clients. (1997 to 2000) Bosek, Gibson & Associates, Inc. Miami, Florida Position: Mechanical Engineer Tasks: BellSouth Telephone Company Mechanical Department responsible for HVAC, Plumbing & Fire Sprinklers. Design/Engineering; Institutional, Governmental & Commercial Projects, Utilities were also covered along with project management, studies, field engineering and interaction with clients or prospective clients. (1990 TO 1997) The Smith Korach Hayet Haynie Partnership Miami, Florida Position: Mechanical Engineer/Mech. Dept. Head Tasks: Southern Bell Telephone Company Group/Air Conditioning Department responsible for HVAC, Plumbing & Fire Sprinklers. Design/Engineering; Institutional, Governmental & Commercial Projects, Utilities were also covered along with project management, field engineering and interaction with clients or prospective clients. (May 1989 to January 1990): Wolfberg, Alvarez and Associates Miami, Florida Position: Mechanical Engineer (HVAC) Tasks: Responsible for engineering and design for institutional and governmental clients. (January 1988 to May 1989): SDM Consulting Engineering, Inc Miami, Florida Position: Mechanical Engineer (HVAC and Plumbing) Tasks: Responsible for overseeing and implementing the design, planning and engineering of projects ranging from schools, light commercial work to convention centers. (1981 to 1987): The Poole and Kent Company Miami, Florida Position: Estimator Tasks: HVAC, Plumbing and Civil Work Estimating. PROFESSIONAL EXPERIENCE: HNTB Corp Miami, Florida Accomplishment: • Grenada Airport Expansion Design • New Toll Facility for the Turnpike in Maine • SR 408 toll plazas • Ocracokee State National Park Mechanical Design Note • Annual Inspections for maintenance and safety at MIA facilities • Specialty Inspections for exiting tenants at MIA facilities • Specialty plan review of turnpike facilities to troubleshoot potential design flaws Bosek, Gibson and Associates, Inc Miami, Florida Accomplishment: • FTLD Main Annex Colocators • FTLD Main Annex chiller water pumps replacement • FTLD HDQT. 8th & 11th renovation work 8th & 11th renovation. • FTLD HDQT. Re-stacking project • Greenacres Administration Building • Miami Grande C.O. • K Street alteration work. • FTLD C.O. additional equipment/new pumps and chillers. • Miami Data Center, Computer chilled water system pumping study. • Ft. Myers BCS equipment study • S.W. corner 8th floor - 451 N. Federal Hwy. • 11th floor sound study & design work AHU-11N. Other projects: • Misc. study, e.g. The Hemispheres; Field design for Dade County Public Schools and a study. • AvMed Chillers/C.T. replacement - Bldgs. 9400 & 9500 • Burdines - Ice Storage & Chillers replacement. • UM - Field observation on various projects. The Smith Korach Hayet Haynie Partnership Miami, Florida Accomplishment: Cedars Medical Center, Completion of Smoke Compartimentation project and other misc. projects. • Chiller and Cooling Tower addition to the main VA Hospital in West Palm Beach, Florida. • Justice Center Support Facility, A district cooling project for Metro-Dade chilled water plant design. With a primary, secondary, and tertiary system • BellSouth 444 Bldg. chiller water loop additional and other misc. projects • BellSouth post billing; and other misc. renovation work • BellSouth Miami Hdqt renovation work • Miami Senior High field observation • Mount Sinai Med. Center; patient wing alteration work • U.S. Coast Guard various misc. projects • HAFB U.S Customs new facility • HAFB various misc. projects • McDill ARB dorms air conditioning systems replacement • Thomas Jefferson Middle School re-roofing • Pan American Hospital; various misc. projects • Completion of Brownsville Middle School • Homestead Senior High School new laboratories and new school fire sprinklers • Miami VA cooling tower completion • Fla. Air Nat'l Guard in Jacksonville Base energy study and other misc. projects • 120 Bed Veterans Administration Nursing Home Care Unit, Palm Beach, and excellent HVAC design team-work project. • Project Manager for Miami VAMC Cooling Tower completion project • Cypress Creek Toll Plaza for D.O.T. A joint venture project with American Engineering Co. performed all the HVAC design and Engineering • Pan American Hospital, Lab Expansion • Cedars Medical Center, Cauterization Lab #3. • Lantana Toll Plaza (ditto as Cypress Creek Toll Plaza) • 120 Bed VA Nursing Home New Chiller And Cooling Tower Addition • Bellsouth FTLD HDQTRS Renovations • FDLE Warehouse Mechanical Design Wolfberg Alvarez and Associates, South Miami, Florida Accomplishment: Boca Raton Community Hospital, all documentation for proposal/presentation to owners: Project already being built. I was congratulated by the department head. • Torpedo Post Run Facility, U.S. Navy Andros Island. A combination of Air Conditioning design and sensitive industrial ventilation project 100% submitted to the Navy and already built by the navy Sea-Bees. • Veterans Administration Medical Center, West Palm Beach, Florida; assisted in some preliminary Engineering and Design. • South Miami Hospital; 1) North Tower Expansion and 2(Chiller Plant Retrofit. Design Development phase completed and approved by H.R.S. • Jewish Community Center, Palm Beach County. Some Engineering design work. SDM Consulting Engineers, Inc. Accomplishment: Engineered and designed new Plumbing, Fire Protection, and Mechanical systems for the Miami Beach Convention Center West Wraparound Expansion. • Florida International University Physical Science Building; assisted in the Engineering for retrofitting the existing Chiller Plant. • DCAD Concourse D-Link, Miami International Airport; Engineered various tenant work projects. • Florida International University, TV Studio North Campus; Complete Mechanical Engineering and Design • EH School; designed some plumbing systems. • Kress Center; Downtown Miami - some tenant work. • Dade County Courthouse Renovations; same location, Design-Development complete, and 100% completion. • Student Housing Services Facility, Florida Atlantic University; complete Design-Development package and FLEET analysis. The Poole & Kent Co Mechanical Contractors Accomplishment: Negotiated projects from a design-and-build starting point offered customers different HVAC systems alternatives accordingly with their necessities. e.g. projected expenses, preference of one particular HVAC system over another and so forth. There were instances in which assisted Consulting Engineers in material selections, and had to design the entire Plumbing and HVAC systems. The company pursued large projects and there was a heavy emphasis in estimating competitively and becoming low bidders in Waste water treatment plants and Water Treatment Plants in various municipalities. EDUCATION: Florida International University • Bachelor of Science in Mechanical Engineering Other: Florida International University, College of Engineering and Applied Sciences, Professional Certificate in Heating, Ventilating and Air Conditioning Design. 1987. The Trane Company, Educational Division, Trane Air Conditioning Clinic. 1991, other various seminars held at Trane Miami Headquarters. Other Engineering society/and different equipment manufacturers Seminars. HONORS: The National Deans List 1984-1985. PROFESSIONAL MEMBERSHIPS: American Society of Heating, Refrigerating and Air Conditioning Engineers, 1985. American Society of Plumbing Engineers, 1989 American Society of Mechanical Engineer, 1992 NFPA, 2006 REGISTERED: No registration held at the present time. (E.I. only) REFERENCES: Will be furnished upon request.

Companies I like:

No idea

Left_template4_bottom

CollapseJob Skills

Left_template4_bottom

CollapseKeywords

Left_template4_bottom

CollapseResponsibilities

Mechanical Plan reviewer of Miami International Airport projects. Protecting interests of Bond Holders, Life Safety Inspections tp Airport facilites and Engineering and design a diverse number of projects
Left_template4_bottom