Description
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
Wsp (Through Aerotek) | Engineer | 8/2017 - 9/2018 |
Croton Water Treatment Plant | Field Electrical Engineer | 1/2017 - 7/2017 |
Rcm Technologies | Electrical Designer | 10/2015 - 1/2016 |
Con Ed Fire Pump Relocation | Sr. Electrical Designer | 5/2013 - 6/2015 |
Subway Systems And Control Department | Senior Electrical Designer | 9/2010 - 4/2013 |
Capultec Engineering | Senior Electrical Designer | 1/2010 - 9/2010 |
Worley Parsons | Senior Electrical Designer | 6/2009 - 1/2010 |
Shaw Group | Senior Electrical Designer | 12/2008 - 6/2009 |
Bantrel Engineering | Senior Electrical Designer (April 15,2007 Dec. 7 2008) | 4/2007 - 12/2008 |
Oil Refinery Design And Field Survey | Senior Design Specialist/ Checker Senior Electrical Designer | 5/2006 - 4/2007 |
Bantrel Engineering | Senior Electrical Designer | 6/2004 - 12/2004 |
May 31,2004 | Senior Electrical Designer | 11/2002 - 11/2002 |
Snc Lavalin | Senior Electrical Designer | 4/2002 - 10/2002 |
General Motors Of Canada Ltd. | Senior Electrical Designer | 12/1994 - 12/2001 |