Description
COVER LETTER: Hi Tech Engineers, Metairie, LA. (URS Subcontractor) 2009 - 2011 100 Year Flood Protection Levee Project - Senior Construction Inspector * U.S. Army Corps of Engineers Quality Assurance representative for the 100 Year Flood Control Project New Orleans east. Utilized COE 3phase system of preparatory, initial, and follow up to maintain quality assurance of the project. These meetings were held with the COE in attendance. * Utilize Resident Management System to document daily work performance by contractor. * Address safety and health issues with contractor's Site, Safety & Health Officer (SSHO) with reference to OSHA and USACE Safety & Health Manual EM385-1-1. Mactec Engineering, Richmond, VA 2008 - 2009 John Kerr Dam, Boydton, VA - Senior Construction Inspector * U.S. Army Corps of Engineers Quality Assurance representative for the Hydroelectric Generator Rebuild & Replacement project at John Kerr Dam. * Address safety and health issues with contractor's representative with reference to OSHA and USACE Safety & Health Manual EM385-1-1 and with compliance to critical lift plans with reference to Activity Hazard Analysis. * Observed testing with reference to the functioning and regulation of generator operations. * Utilize Resident Management System to document daily work performance by contractor. * Attended daily pre-work meeting where contractor addressed safety issues and prevention by way of Activity Hazard Analysis plan. * Scope of work required me to obtain US Government (NACI) clearance (2008).