Description
Designed and documented machined, sheet metal and plastic parts. * Created component specifications for internal/external cables used for enclosures and cabinets. * Cable design considerations included strain reliefs, pull-tabs, service loops and system cable routing. * Designed plastic parts for doors, bezels, light pipes, card guides, control panels, cable connector housings, module loopbacks and retractable power cord enclosures. * Created Mechanical Control Drawings for printed circuit boards (PCB), flex circuits, backplanes and hybrids. * Developed and implemented assembly processes for modules, backplanes, hybrids and sub-systems. * Created component specs for PC's, Cabinets, Enclosures, Printers, Test & Capital Equipment and fixtures. * Developed and implemented industrial packaging for products, sub-systems, and field replaceable units. * Transitioned several products into domestic/international manufacturing. * Transitioned and implemented of distribution strategies for domestic/international field service branches. * Created and documented product labeling specifications, drawings and product manuals. * Debugged designs and implementation of prototype builds and seed units for marketing and customers. * Experienced interfacing with marketing, sales, manufacturing, field service, vendors, investors and customers. * Experienced writing equipment justifications, cost analysis and schedules. * Experienced in providing direction of engineering design and cross-functional project teams. * Identified design and manufacturing problems/issues and implemented corrective actions. * Developed Drawing Vault/CAD Library for drawings, 3D part/assembly models, components and hardware. * Team member who helped deliver multi-million dollar solution for HP Water Cooled & ECO Pods. * Redesigned technical office environment platform. Met product cost goals and enhanced functionality. * Documented and delivered Kerastick Krusher Reliability Test Fixture and 4" Caster Field Kit for BLU - U Unit. * Designed and implemented Assembly/Disassembly fixtures for multiple configurations of Camera Heads. * Created 70% drawings for MailDefender™ for assemblies, weldments, build kits and Field Replaceable Units. * MailDefender™ Basket Assembly redesigned and reduced cost by $650. Approximately 1/3 of overall cost. * Reduced Stack Box Program schedule by 4 months. Implemented good Design For Manufacturability practices. * Designed and delivered (60) test equipment designs into manufacturing in three (3.5) years. * Responsible for USPS Office Systems Integration projects that produced $400M dollars in 4 years. * Over 600 USPS customized systems shipped without missing a shipment. * Designed and implemented module, backplane, hybrid assembly processes/fixtures for VAX6000 & VAX8000. BERNARD J. LINK, JR. 978-464-2489/978-808-6584
Work Experience
Education
SCHOOL | MAJOR | YEAR | DEGREE |
---|---|---|---|
Wentworth Institute of Technology | Mechanical Engineering Technology | 1983 | Bachelor Degree |