Rss

David T

BATCHELOR & KIMBALL, INC. Mar 2013 - Present Site HSE Manager

Occupation:

Hazardous Materials Removal Worker

Location:

Hinesville, GA

Education Level:

Bachelor

Will Relocate:

YES

CollapseDescription

• Was responsible for all aspects of Health, Safety & Environmental legal and regulatory compliance • HSE program implementation/sustainability in multiple plant sites for the North American region • Provided Health, Safety and Environmental leadership for all business and manufacturing operations • Ensured compliance with HSE laws and regulations while maintaining appropriate business flexibility • Developed risk assessment methods/systems for anticipating, identifying, and evaluating hazards • Ensured client needs were met, and helped the client's company to be more profitable by protecting their most valuable asset, their employees • Bachelor & Kimball, the pre-construction phase is a critical first step to any project. The pre-construction process lays out the groundwork for delivering successful projects that are delivered on schedule and on budget. During pre-construction we look for ways to deliver a project more efficiently and safely by maximizing pre-fabrication. • Train Workers on Job hazards analysis and Activity hazards analysis, Position Hazard Analysis (PHA) • Mechanical Construction • Plumbing Construction • Train workers how to process and high-purity piping • Design-Assist • Design- Safety of Buildings • Sheet Metal • Insulation • Fireproofing • Concrete Cutters • The safety of putting in flushing systems for 42’inch pipe for data centers • Data Center Cooling Towers • Manufactured and Modular Construction • Integrated Project Delivery • Lean Construction Delivery • Commercial Roofing Full-service Single Ply, Vegetative Roof Industry on the Data Centers • Conducted site safety audits and compliance inspections in accordance with OSHA and other site safety regulations • Executed site-specific safety orientation training for all new jobsite employees • Guided 15 subcontractors and maintained documents for over 5K personnel • Work with the Training Department to deliver activity-appropriate training programs, including required OSHA programmatic subject matter • Reviewed/approved area assessment reports and corrective action plans assuring compliance with applicable OSHA and EPA regulatory guidance • Worked with a confidential client with an average daily construction site population of 2K personnel, and a $7B operations budget • Achieved 7.6 million-man hours without a lost time accident on confidential client job site • Mechanical Construction • Plumbing Construction • Process and High-Purity Piping from 2 inch to 48-inch Steel and PVC pipe • Design-Assist • Design-Build • Manufactured and Modular Construction • Integrated Project Delivery • Lean Construction Delivery • Levees- Pump House • Road Building • Allstate Crane Versa Crane Big Blue crane /C900 Crane/TC-28000 440-ton / Terex- Demag CC-2400-1 as the tail crane/Grove Mobile Telescoping Cranes 300ton Height 393ft • 730-740 Dump Trucks, Excavators, Dozers, Rollers, Wheel Loader, John Deere 9630, Tractor, Scraper, Motor Graders. •

Right_template4_bottom

CollapseWork Experience

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom