in house preparation of relevant technical documentation which includes work method statement work execution plan testing of all install equipment management of all personnel day to day activities on site and other relevant transmittals required for the execution of the project. Provide technical guidance advice and instruct project team. * Managed and coordinated the progress of all the electrical/instrumentation engineering in Root Cause Analysis of failure (s) work alongside the project controller in relation to scope budget and schedule Responsible for communicating work progress and project status to client and supervisory consultants as it relates to electrical works on the project Ensured that all the Client's health safety and environmental regulations were complied with for zero records of LTIs and actively apply the LTI/AA Prevention Plan * Ensured quality control inspections on all electrical/instrumentation supplies and construction carried out