Rss

Kenneth C

Manager

Occupation:

Manager

Education Level:

Master

Will Relocate:

YES

CollapseDescription

Summary Engineering, Project Management and Business Analysis background. Improve organizational processes to promote greater efficiencies utilizing LEAN\6Sigma tools and methodologies. Contribute significantly to customer satisfaction through technology integration, automation, and training. Assume control of underperforming projects to successfully deliver goals on time and within budget. Collaborate effectively with stakeholders to translate their desires, requirements, and limitations into efficient, sustainable solutions. Areas of Proficiency Requirements/Systems Analysis Process Re-Engineering/Improvement Information Management Systems Quality Systems Systems Implementation/Integration Project/Operations/Technology Management Key Achievements * Created and managed a division to provide document conversion and systems implementation services to both the government and private sectors. * Led the development and deployment of an automated metrics system utilizing SAP ERP and other internal/external databases to analyze and convert data to graphically display the health of the organization. * Assumed control of a failing project. Working with stakeholders analyzed requirements and existing processes, developed new processes and increase efficiency 317%. Successfully completed the project. * Led projects for the California State Assembly to: develop a custom information management system, convert historical documents to electronic form and develop multimedia tutorials for Assembly Members. * Managed multiple concurrent process improvement projects for NSWC Corona Division. * Developed process and quality assurance procedures based on TQM principles and led projects preparing departments and end users for ISO9000 certification. * Managed a program to control distribution and inventory of test equipment deployed to the U.S. Navy Fleet worldwide. * Established standardized procedures for performing engineering analysis of automated test equipment (ATE) hardware and software, decreased analysis time by 20% while improving consistency and accuracy.

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom