Description
PROFESSIONAL SUMMARY Project Engineer/Pre-Commissioning and Maintenance Engineer - 18 years SAUDI ARAMCO :( Saudi Arabia) Contractor: SR. Technical Consultant/Lead Project engineer: From 07/2015 To 07/30/2017, Work with power block division at Jizan IGCC Refinery division on erecting, installation, and pre-commissioning and commissioning all rotating equipment. ALSTOM POWER oOEM Steam and Gas turbine component retrofitting and installation and Sr. Technical Field Service Engineer: From 01/01/ 2013 To 04/01/2016, work for ALSTOM POWER COMPANY as a Turbine engineering technical adviser on oOEM Steam & Gas turbine components retrofitting and installation engineer. UHDE/GMBH (GERMANY) Commissioning & Maintenance Engineer: From 05/2011 To 10/2012 work as Freelancer, Commissioning engineer for UHDE/ GMBH German Corporation company out of Algeria GE, Oil & Gas Technical Assistance: From 04/2009 to 04/2011 work as field service engineer for GE's Oil & Gas field of work. as Technical Director: in Cape coral, Florida, - work as Project engineer as well as Maintenance engineer on numerous types of GE Steam turbine unit that include D11 and G2& G3 Steam turbine unit and BB44 Siemens large Steam Turbine and Generator Maintenance outage. Work as Project Engineer: in Woodbury, New jersey-To Design a coal refining Steam vessel for Coal fire power plant Company, and analyzing of Coal character, such as N0x, C02, Mercury, at Gillette Wyoming, Coal refinery project (KFX) Elliott Turbo Company Sr. Technical Representative: From 02/2008 to 03/2009 Worked for Elliott Company as field technical representative based in Houston, TX but travel to Latin American Countries to perform the job on different design of Centrifugal and axial compressor and different design steam turbine. Siemens PG Siemens Westinghouse Power Corporation: -Field service engineer and Operation & Maintenance Manager: From 01/2000 to 02/2006 worked At Siemens PG, in US as well as in North Africa, such as Morocco, Algeria. On single and Combine Cycle unit, also worked as Gas and Steam Turbine Field Service Maintenance Engineer: based in Houston but travel at Nemours geographical location in US to perform the job. The unit that involved during this period are the following, 501G, 501F, W501FD, W501FC, W501FD2, W501G, - W501G, W501F, V94.3A Gas turbine unit and Mature Frame Installation, During this period in Kingston, Jamaica - Millennium Power Project (Massachusetts) 180MW Steam turbine unit - Londonderry Power Project (New Hampshire) 220 MW Steam turbine unit I oversee and lead a major outage that included the removal of the Generator rotor and Steam turbine stationary and rotating components such as HP IP LP turbine blade for repairs and installation. I also worked on the repairs of different type of valves Boiler feed water pump auxiliary components lube oil pump as well as lift oil pump and boiler components such as HP IP LP drums boiler blow down vessel boiler burner and boiler tubing repair. Generator work the sites listed above I performed outages that included generator components repair work. I inspected and repaired three types of generators such as open air cool generator closed air and water cool generator and Hydrogen cool generators. Designed coal refining vessels and analyzed coal character in terms of BTU upgrading and minimizing of emission system such as CO2 NO2 S and Mercury for coal fire power plant companies. I also worked as Field Service Engineer at Gillette Wyoming KFX Coal fire refinery plant. During this period my responsibility was to lead a crew of maintenance personnel for repairs of different type of coal fire power plant components such as control valves non-return valves or check valve extraction valves emergency stop valves over load valves feed water pumps auxiliary lube oil pumps and the main lube oil pump. Worked also on repairing of coal pulverized components and completed boiler work such as repair of HP and IP drums repair of control valves repair of steam pipes repair of steam heating tubes boiler blow down pipes and repair of duck burners. Equipment/Technology: Alstom steam turbine unit that include D11 and D12 steam turbine unit and Westinghouse Steam Turbine and Generator Maintenance outage.