Flash_bad
We couldn't find the Online Resume you're looking for.
Rss

Jose B

Petroleum Engineer - 13 Years of Experience - Near 77450

Occupation:

Petroleum Engineer

Location:

Katy, TX

Education Level:

Master

Will Relocate:

YES

CollapseDescription

Petróleos de Venezuela (PDVSA) Reservoir Engineer Cabimas Venezuela May 2012 - May 2017 * Performed data analysis and provided recommendations to achieve four (06) new wells drilling two (04) re-drilling well and other maintenance operations in Lake Maracaibo. * Played a key role in the development and the integration of the sediment model with the structural model well model pressure analysis and reservoir calculation in a field of condensed gas exploration and carbonate reservoir of Oligocene-Miocene in the Gulf of Venezuela. * Designed the baseline production curve by wells 405 wells were evaluated to set up the gas production start point and its decline rate. * Analyzed well production performance and provided reservoir engineering support to assist completion engineering design and programs. Identified deferred production creating a work plan to reduce the deferred production through reservoir potential studies. * Prepared production forecast and provided production optimization through nodal analysis operations and production data analysis PLT test XPT re-perforation and historic production data over 300 wells for annual reserves reports. * Evaluated well performance and performed reserves analysis and performed economic analyses to maximize the value of infill development plans. * Recommended technical proposals for candidates to workover snubbing re-drill sidetrack acidizing job and isolation water influx layers the incremental production is around 5 - 10 Mbpd and identified opportunities for exploitation in conventional and unconventional reservoirs. Petróleos de Venezuela (PDVSA) Frac/Acid/Stimulation Field Engineer Cabimas Venezuela May 2008 - May 2012 * Analyzed stimulation location prior to treatments to develop a layout for Frac equipment and placement of customer facilities (pits/tanks/etc.). * Managed logistics and quality control on location and monitored job parameters such as: depth pressure temperature. * Ran various software packages and trouble shoot IT problems and transmitted data real-time for remote client viewing. * Removed safely all Frac equipment from location after treatment is completed and provided staff to assist Maintenance Personnel when needed. * Provided effective communication regarding continuous improvement initiatives and participated in the development of policies and procedures. * Worked well with all business units to ensure a trouble free operation and ensured adherence to policies & procedures. * Participated in budgetary development and review and provided technical support to customers through the use of industry applications. * Reviewed job program proposals to understand treatment specifications presented job design proposals specifications and procedures to customer on job site and made with clearly defined procedures and guidelines routine technical decisions. Assisted more senior engineers in the preparation of plans calculations reports etc and generated reports with a high attention to detail. Petróleos de Venezuela (PDVSA) Production / Artificial Lift Engineer II Cabimas Venezuela Aug 2004 - May 2008 * Monitored and evaluated the oil and gas production in more than 450 wells in Lake Maracaibo. * Elaborated monthly oil and gas production allocations for the active wells and reviewed monthly production allocations for inactive wells. Participated and interacted with Reservoir Engineers Flow assurance Engineers and other professionals in technical studies concerning oil and gas operations as assigned and elaborated budget preparation and monitored expenses and profitability of operated and non-operated fields. * Prepared estimated monthly production for the operated and non-operated fields. * Monitored the right functionality of the Production Operations Database ensuring that the data was aligned with the operation reports of the producing fields and interfaced with operators and partners for the Lake Maracaibo producing fields. * Selected the method of production wells identifying the best method that applies over 500 oil wells and controlling and monitored about 150 wells monthly that belong to 7 flow stations of gas and oil and made the gas lift balance to determine if the gas lift valves are operating right and if the casing and tubing pressure is the optimum achieving to recuperate 2000 oil barrels. * Made nodal analysis to optimize de oil and gas production through simulations in Pipesim and WellFlo Software and performed production modeling and identified off-trend wells and made recommendations for workover and artificial lift modifications. * Identified information needs (data and production records) required by field development. * Emitted judgment on the accuracy of production data based on the analysis and diagnosis of system characteristics ground-surface within a range of uncertainty set and determined the causes of the decline in volumes of oil and gas. * Evaluated the performance of production wells with respect to their potential and developed service programs wells. Kept interaction with Production Supervisors Production Foreman and Lease Operators to optimize production and supervising the economic analysis and participated in the homologation and standardization of the quality management system of Pdvsa (Standard iso-9001).

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom