Description
Summary Developed expertise in delivering engineering and construction management services for the both small and large public and private sector projects. Projects involved the design and construction management of sewerage and water systems, crude oil pipelines, utility relocations to mitigate impacts arising from proposed heavy rail commuter, freight, and light rail transit systems. Additional experience involved the design and construction management of FAA aviation facilities, design of commercial and residential land developments including the planning, design, and construction of high technology facilities. Managed design consulting services and contractors, supervised in-house staff in preparing comprehensive technical studies, pre- and final designs, and writing technical specifications developed and implemented construction quality control programs and procedures performed contract administration duties involving RFIs, Construction Change Order Requests, and submittals by contractors. Performed construction quality control audits of contractor activities and conducted value engineering studies, cost estimates and constructability reviews. New York City Hunts Point (200 MGD) & Bowery Bay (150 MGD) Sewage Treatment Plants Assisted Project Manager Design-Build, supervised a team of engineers and CAD personnel in the research and base mapping of all existing utilities along the Los Angeles, Alameda Transportation Corridor and provided utility design support to mitigate utility impacts for program development and utility coordination. Proposed and provided preliminary sewer designs to mitigate impact issues from the rail project. * Pasadena Gold Line the first phase of the Gold Line Light Rail Led a team of design engineers and cad technicians on the light rail Los Angeles to Pasadena Gold Line design-build project to mitigating utility interferences. Prepared hydrology reports and designed new storm drain infrastructure for LABOE approval. Prepared water line mitigation designs for LADWP approval and sewer mitigation sewer designs for LABOE approval. and Marmac Corp10/89-6/90 Cerritos, Ca. Supervised a team of engineers and design drafters in preparing civil plans involving paved access roads, site grading, drainage infrastructure, and specifications for a crude oil pump station located in Goleta, California. The system is a 1,233-mile pipeline that connects oil fields in California with West Texas. * The South African Coal, Oil and Gas Corporation Limited (SASOL) 200 B/D Refinery in Esfahan Iran
Work Experience
| COMPANY | POSITION HELD | DATES WORKED |
|---|---|---|
| (Confidential) | Resident Engineer | 1/2019 - Present |
Accomplishments
Highlights:
Keywords

