Rss

John C

Engineering Project Manager- 20 Years of Experience - Near 13088

Occupation:

Engineering Manager

Education Level:

Master

Will Relocate:

YES

CollapseDescription

Areas of Expertise * Construction Management * Contract Administration/Coordination/Change Order Control * Project Analysis and Evaluation * Corrective Action Plans * Team Facilitation and Management * Constructability reviews * Outstanding Liaison Abilities: Safety, Quality, Schedule, and Budget Career Highlights Independent Turbine Consultants - seconded to EthosEnergy Field Services Houston, TX 1/2017 to 6/2017 Project Manager/Senior Field Engineer - Quantum's Hiram Clarke Peaking Power Plant - Houston, TX - Simple Cycle-W501D5 Combustion Turbine Generator (129 MW-max- gas) * Mechanical assembly works outside of the centerline turbine re-assembly (Siemens scope) - included Selective Catalytic Reduction, connecting piping to Turbine and air and water systems, Air Inlet Ductwork and Housing, Evaporative Cooling, Mechanical and Electrical Accessories as well as fuel gas conditioning equipment and aqueous ammonia system * Supportive role to Siemens in all peripheral Turbine work * Offload and set all Mechanical and Electrical Equipment Simple, procure and install - systems for SCR and exhaust stack, Open Wet Cooling Towers, Auxiliary Transformers and Control System for both CTG and Balance of Plant Project Manager - Various facilitating functions * Warranty Manager for NRG's Petra Nova Parish Peaker Project * Project Development for various proposals including subcontractor evaluations for best geographic fits * Project Execution Plan incorporating strategies for project implementations * Streamlining processes to insure better probable success in proposal and project success * Negotiation with Owners on both technical and commercial elements of the EPC Agreement John D. Cherko Page 2 Cycle - GE 7EA Combustion Turbine Generator (72 MW) - EPC Contract- Included Refurbishment of unit originating from Saudi Arabia Responsible for total project safety cost quality and timely completion * Fast Track project targeted for completion for prime summer demand season for power completion of project in 9 months * Scope of work included the disassembly inspection testing refurbishment and re-assembly of the Turbine and Generator

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom