Description
and Rauwerd-1 & 2. I Checked all the Pipe supports of the 4 Gas Drilling Locations. I Designed all Instrumentation Hook-ups and Connection details of the 4 Gas Drilling Locations. I did the Coordination of all the Piping & Instrumentation for the PETROLAND Project. Designing of the Piping Layouts for the Kationogeen Starch Project. Making of the Requisitions and Specifications Key Qualifications: 43 years of experience in Piping / Mechanical Engineering & Flexibility Analysis according to the Basic & Detailed Design and Engineering of Process Piping for Oil & Gas in Onshore & Offshore FEED and EPC, Brown Field & Greenfield Projects, FPSO'S, Refineries, Chemical Plants and Power Plants (CCPP'S).