Rss

Roy E

General - 20 Years of Experience - Near 80815

Occupation:

In Between

Location:

Flagler, CO

Education Level:

Master

Will Relocate:

YES

CollapseDescription

Mentoring and Kuwait Gulf Oil Co. (K.S.C.) Texas, USA Responsible for coordination and development of Well Strategies needed for Full Field Steam Flood (FFSF): Well Design objectives (e.g. VBWO, PFO, Specifications) & FFSF strategy for all Well Scope, concept selection and assurance, execution objectives & strategy, EPC strategies, Scope Checklist and interface confirmation, Ph3 readiness (OC, Contracts, etc.) Develop FEED quality Engineering, Procurement, and Execution plans and achieve Ph4 readiness assurance Obtain FID approval for Well Scope Support detailed engineering, procurement, execution, operations readiness, lessons learned and learning plans Transition at FID to main drilling organization for them to deliver effectively +$5B of Well Scope per FID in Wells ADP concept: All Well Scope at each pad - All FFSF Wells required - ready for hook-up & operation Each Well's checklist for Scope Completion approved All Wells to be delivered in alignment with VBWO and D&C Performance Expectations. young engineering staff with respect to ERD/UBD and performance motor drilling. Engineered and designed two 25,000 Ft HTHP H2S injection Wells that entailed RC UBD as well as abnormal pressures with 10% H2S near TD-While-Drilling (to be drilled at 10,300 Ft Elevation in Rockies). Supervised writing of Well prognoses' preparing AFE documents setting up logistical support.

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom