SUMMARY Over Thirty (30) years of progressively responsible positions in all facets of Quality Construction and Operations for the Nuclear Power, Gas Turbine, EPA - Air & Water Pollution Clean-Up (i.e., Wet/Dry Scrubber, Bag House, Electrostatic Precipitator), and Department Of Energy (DOE) industries. I have assisted in developing a Preventive Maintenance Program for mechanical, electrical equipment, & civil installations which included a thorough research of Code and Vendor Manual requirements. I have performed in QA/QC Plant Construction (i.e., inspection activities and program development), System Turnover for Operation and verified Commissioning requirements for turnover to the client. (Also, See Attachment "A, " Page 4.) (This assignment was a 3 Year Outage Satisfying NRC Commitments) ( Wrote WORK CONTROL ADMINISTRATIVE and ENGINEERING procedures for Unit 2 start-up. ( Verified Plant Configuration with FSAR SAR Tech. Spec. & Procedures through FIELD WALKDOWN. ( Performed ROOT CAUSE ANALYSIS and evaluated Corrective Actions for Adverse Condition Reports. ( Performed QA AUDITS/SURVEILLANCES on Maintenance and Work Control activities. ( Reviewed and verified Plant Organizational responsibilities FSAR Licensing Engineering ( Prepared Design Change Notices (DCNs) for Electrical One-Line Elementary and P&ID drawings. * Up-dated above responsible procedures when needed.