Rss

Contact_user

Marc S

Maintenance Manager - 10 Years of Experience - Near 38672

Occupation:

Production Manager

Location:

Southaven, MS

Education Level:

High School/GED

Will Relocate:

YES

CollapseDescription

Summary: Experienced professional with over 15 year's maintenance and production management experience. Responsible for maintenance departments for facilities producing 20M (City Brewery) and 18M (Coca Cola) cases annually. Forward thinker- able to visualize and clearly communicate complex ideas and transfer into actions. April 2012 - Blues City Brewery June 2016 Memphis, TN Maintenance Manager (Feb 2015 - June 2016) * Responsible for maintenance budget and all capital expenditure requests related to manufacturing * Managed project planning for all projects from concept, pre-planning, planning, quoting, ROI, proposal, approval, implementation * Successful implementations include: * Installation of ARB Laner\Turner ($160k) * Upgraded to KAYAT TP-50A tray packer ($250k total, saved approximately $170k by purchasing used equipment) * Installation of fully automated keg line ($2.2M) * Installation of Entire Packaging Leg to reduce the number of days another line would be running on overtime Maintenance Supervisor (April 2012 - February 2015) * Supervised 25 maintenance mechanics and electricians. This included direct supervision, scheduling training, annual reviews and discipline. * Responsible for the preventive maintenance, daily operation of unscheduled maintenance of 7 high speed production lines. * Managed the installation of all new equipment installed at the facility ranging from new conveyor installation to new packaging equipment installation. * Implemented many projects during this period to facilitate the most efficient redesign of the old Coors facility for the purpose of the current client base and package configurations. Sept 2008 - Coca-Cola Enterprises Inc. April 2012 West Memphis, AR Maintenance Supervisor * Responsible for direct supervision of seven mechanics and for all preventive and routine maintenance of two high speed production lines. This includes daily supervision, scheduling, training, annual reviews and discipline. * Oversaw various product implementations including but not limited to the new 18-pack, 20-pack and 28-pack configurations * Managed the installation of several pieces of equipment including new laser coding equipment, new air compressor and a new Nigrelli Envoy Packer * Tracked daily production against key business indicators as determined by the yearly budget including raw material yield, syrup yield, safety and overall plan efficiency * Due to increased volume, a night shift production team was added. As the maintenance supervisor, was responsible for maintenance as well as all other facets of production during this shift. Dec 2006 - Spirco Manufacturing Sept 2008 Memphis, TN Production Manager * Oversaw daily production of all facets of the manufacturing of pre-engineered steel buildings * Managed 20 employees in four areas including the Roll-forming, Hardware, and Trim Shops and the Shipping Department * Tracked daily production against production goals and maintained an operating efficiency of greater than 90% * Implemented a quality initiative program by which employees were held accountable for mistakes and rewarded for quality of work * Monitored production yield on raw materials in an effort to effectively reduce scrap Feb 2000 Coca-Cola Enterprises, Inc. Dec 2006 Memphis, TN Lead Mechanic / Electrician * Assisted in scheduling both routine and preventive maintenance on high speed packaging equipment and production systems * As lead mechanic, assisted maintenance department in increasing production efficiency from 80% to 92% over a six year period * Led various projects to upgrade equipment including but not limited to: Installing new laser coding machines, replacing bottle filler, and upgrading the PLC on carbonation cooler from PLC2 to PLC5 * Performed routine and preventive maintenance on high speed packaging equipment and production systems including but not limited to: hydraulics, pneumatics, water treatment systems, electrical and Programmable Logic Controllers July 1997 Birmingham Steel Corporation Feb 2000 Memphis TN Mechanic / Electrician * Planned routine maintenance for the rolling mill department * Troubleshot and repaired high speed production machinery including but not limited to the following: motors, pumps, gearboxes, chain drives, hydraulic systems, pneumatic systems, water cooling systems, automatic lubrication systems (oil and grease), overhead cranes, emission control systems, A/C & D/C controls * Performed shop fabrication including cutting and welding (Certified Structural Welder, 4G/5G) Sept 1994 - Carrier Airborne Early Warning Squadron VAW-120 June 1997 United States Navy Norfolk, VA Line Shift Supervisor * As Certified Plane Captain, supervised and trained 30 airmen during field operations including but not limited to: aircraft launch and recovery procedures, inspections, refueling and all other ground operations * Qualified as Aircraft Flight Line Coordinator * Coordinated and communicated with the Maintenance Control Chief all ground operations, launches, recoveries and aircraft movement Dec 1990 - Attack Squadron VA-85 Sept 1994 United States Navy Virginia Beach, VA * Assigned to Airframes shop working on hydraulic systems and performing structural repairs * Worked on both the Flight Line and Flight Deck as a troubleshooter and final checker for all aircraft launches

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom