Description
Marathon Texas City (Galveston Bay Refinery) from 2015 thru 2016 I was involved in many different jobs ranging from the Docks (marine) to inside Refinery Process Units. I designed roads and misc. foundations at Dock 54 Rehab Project. I did field work Test Trenching Drawings to locate all unknown underground interferences. I Modified hand railings added new foundation for equipment skid stiles and other duties to insure the job was copestitic. I did New Sump modification on concrete and added structural steel above it. I have worked at S&B Engineers for over 25 years. I also currently hold the TWIC card.
