Description
Experienced with track and circuit pad repair and replacement. * Used Pace Repair System, solder extractor system for through-hole, fine-pitch and variety of surface counted assemblies. Worked using both binocular vision and mantas microscopes. * Solder paste and flow solder experience. Ciena, Savage, Maryland May 2000 - October 2001 Electronic Assembler * Repaired, reworked PWB's for fiber optic cassette assemblies. * Worked with test technicians troubleshooting failures. * Soldering was done under a microscope. * Organized and prioritized repair work before shift start to expedite the flow of work back to test. M/A Com Signit, Hunt Valley, Maryland, September 1997 - May 2000 Electronic Technician * Troubleshot for wire drawing and fiber optic cabling. * Inspected and assembled parts. * Used measuring devices that were computer assisted. * Built chassis and sub-assemblies using billing material and drawings. * Built p.c. boards, hard line cables, coax cables, wire harness, inductor winding, soldering, using crimp and hand tools, and depth gauges. * Inspection of soldered assemblies, PWA's and small chassis for medical equipment.
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
(Confidential) | Electronic/Mechanical Technician Preparing A Production Lab | 9/2015 - Present |
Flir Systems | Electronic/ Mechanical Systems Technician | 3/2014 - 9/2015 |
A Xerox Company | Lead Technician | 11/2009 - 10/2013 |
Practical Technology | Electrical/ Mechanical Assembler | 2/2006 - 11/2009 |
Rockwell Collins | Electronic Technician/ Assembler | 12/2001 - 6/2005 |
Ciena | Electronic Assembler | 5/2000 - 10/2001 |
M/A Com Signit | Electronic Technician | 9/1997 - 5/2000 |
Gichner Shelter Systems | Electro/ Mechanical Assembler | 5/1994 - 11/1994 |
Eog | Electronic Assembler | 11/1993 - 5/1994 |
Westinghouse Electric Corporation | Electronic/ Mechanical Assembler | 8/1981 - 12/1992 |