Description
Concrete Blocks lifting, Unloading andrkowBargeShiftingby using Mobile crane (TADANO 50 TON) Project #2 : Dubai Metro Project, Dubai and Abu Dhabi ADNEC Quay wall project. shifting and placing in Sea shore by using Crawler crane Project #3 : Eastern Mangroves (Angsana Resorts Development SPA and Hodariyath Bridge. 35ton tadano crane12mtr shet pile baundile Loading umloading&150 ton crawler crane sheet pile piling work Gulf Refinerynew pipe lines and storage tanks. Material loadingunloading lifting pand ipesheet piles (crawler crane 80 ton Hitachi mobile crane 35 ton & 50ton tadano 12 and storagenewtanks with pipe line project - jebelali Dubai:-] 2011 -l workingGulf refinery pipe line Cs 12 mtr pipes loading unloading works in refinery's area with safety and joined with other pipe lines loadingErrection works for pipe fittings (tadano 35 ton 50 ton mobile cranes) working ship port jetty Quay wall project Concrete Blocks 200 mtr Concreting work (Tadano-45 ton) Dubai International Airport EXPO landside airside site work (six well crane 50 ton)& (TADANO 50 ton crane)
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
(Confidential) | Crane Operator Crane Operator | / - Present |