Description
umar_farooq0442@yahoo.com Mobile Phone:+966583738626 (SAUDI ARABIA) SINDHI MOHALLA OKARA PAKISTAN +923325449383 MUHAMMAD UMAR FAROOQ OBJECTIVE Applying for the vacancy of (Electrical SUPERVISOR ) EXPERIENCE 1-AL-FANAR CONSTRUCTION AND ELECTRICAL INSTALLMENT COMPANY (SAUDI ARABIA) • I am working as an Electrical Supervisor in this company at PROJECT 107 NEW HERMAIN HIGH SPEED RAILWAY FROM MEKKAH TO MADENA. • Presently in this project I work with ABB and HYOSUNGCompanies installationof 380kV/110kV/33kV/13.8kVGIS SUBSTATION AND 500MVA TRANSFORMERS. • Install batteries in a battery room and maintain the gravity and electrolyteand arrange the lightning system. • During earthling with THERMO welding/CAD welding. Worked of cables landing and termination of the panels, wiring work of AC and DC lighting. • I also got the trainings of Electrical Safety and Lookout. • I worked with commissioning and testing team to test theGIS CB ,T/FS and BUSBAR protection and control circuit. Fire alarm conduit wiring and installation. I participate to installation GIL gas insulated line 380kV with ABB company in Rabek power plant. • Telephone exchange and site generator also run under mine supervision. 2-Interloop Pvt. Ltd. Faisalabad (PAKISTAN) I was Shift Incharge (OPERATION WORK) in Interloop Pvt. Ltd. Faisalabad. During the stay in this organization I performed the following tasks: • Erection of gas engine 3*3MW(JGS620GSNL) Jenbacher with gas compressor. • Diesel engine 3* 1.5 MW (QSK60) Cummins.And2(JGS320GSNL)1MW. • OPERATION of diesel and gas generators sets and parallel (synchronizing ) of alternators also done. • Coupling of HT panels (incoming and feeder panels). • Deal with DOL, Star Delta, Reverse Forward Circuit, and testing of motor ,Loop check ,JB ,CP, Cable termination and transformer. • Major test of insulation of cable of the motors and generators. • Earthing of motors transformer, generator, panels and building of the plant.And NGR of transformer. • Erection, Operation and Troubleshooting work of Heat Recovery System. 3-Mughal Steel Pvt. Ltd. Lahore(PAKISTAN) • I worked as Shift Supervisor (OPERATION WORK ) in Mughal Steel Gas Power Plant. . During my stay at there from march 25, 2005 to april 04, 2006. • I have done the erection of 3*3MW (JGS620 GSNL) Gas engine (jenbacher) 11kv and done also commission. • I have done work on overhead 11kv transmission line. Coupling of LT and HT panels installation of auxiliary equipment and termination of motor control center. Termination generator control panel and HT panels. EDUCATION Degree/Certificate Subject Institute Year Diploma of Associate Engineering Electrical Technology Punjab Board Of Technical Education Lahore 1999 Matriculation Science B.I.S.E Faisalabad 1991 Computer Certificate Office-2000 Window-98, 2000 Soft Computer College Faisalabad 01-01-2004 To 30-06-2004 LANGUAGE SKILLS Effluent in understanding, speaking and writing English, Urdu and Punjabi. PERSONAL INFORMATION Father’s Name:Talib Hussain Nationality: Pakistani Marital Status :Married CNIC Number :37405-0343410-9 Iqama Number: 2315774881