de Marcona * Construction Supervision of the expansion of the SE Mina with a new transformer with a capacity of 25 MVA 60 / 34.5kV 60kV extension bar yard equipment switchgear output loads and 34.5kV GIS Siemens technology equipment. Development of detailed engineering discipline Communications Electrical & Substation Transformer of 115 MVA 220 / 13.8 kV Transmission Line High voltage 220 kV Substation from Tap Off to Santa Fe Energy and Turbo Generator Plant of 125 MVA 13.8 kV generated from biomass. * Calculation of the grounding of the substation Power Flow Short Circuit Studies Studies in Tele protection Protection Coordination Stability Study of Power Harmonic Study using Software of Electrical Engineering SCADA and Control System Data Transmission System in Real Time (SITR).