Description
Harry Duran 1736 Winding Oaks Drive Orlando FL 32825 407-208-0175 Fax: 407-384-2653 Cell: 407-668-2121 Email: diam0930@yahoo.com Summary of Qualifications Quality Control you may consider me as a possible candidate. I have more than 18 years of experience in quality inspection of deliverable products, with the ability to independently read and understand engineering drawings (mechanical drawings, parts lists, and schematic diagrams), bills of material, and specification sheets. Direct experience in mechanical inspection perform visual and measured inspections of incoming, in-process, and/or final assembled mechanical products to verify conformance to specifications, engineering drawings, and military standards, - Experience with Geometric Dimensioning Tolerance ANSI 14.5- 1994 and up dated course with GD&T Hierarchy ANSI 14.5- 2009, Control nonconforming materials and products. Assist in the development revision of internal procedures, instruction. Collect data and records in tables and charts to SPC standard practices. CMM, Giddings & Lewis Sheffield Mitutoyo (programming) Level 1 & 2 CMM Measurement Concept Course Completed, 1995 Excel 36 hour accredited lead audited course. (ISO900) Maintain calibration records of equipment used in production floor and quality inspections department. I feel I could be valuable asset to your company. I have included a copy of my resume as a first step in securing a QC position. Experience EMF, Inc. 4/2014-9/2014 - 124 Imperial St, Merritt Island,FL32952 321-453-3670 • Responsible For: The In process inspection on partially incomplete parts at all stages of machining. • First articles inspection reports, Verifying material requirement s including metals such as steel, stainless steel, aluminum, high nickel alloys, brass, copper, and titanium; plastics, and Delrin. • Specialize in Custom Metal Fabrication requiring the interpretation of welding symbols to prepare the joints and apply welding understanding size dimensions and location of reference lines and arrows that describe the necessary details in the Welding inspection process Diamond Quick Lube & Automotive Repair Shop – 01/2003 10/2013 10 year experience Altamonte Springs, FL 32701 – Own and Operated 4 bay automotive repair shop with six’s employees. 407-260-9199 Services Manager • Responsible for: Ensuring a customer experience that meets or exceeds the customer satisfaction. • Test driving the vehicle, trouble shooting performance issues and implementing a Customer Work Orders identifying cost of parts and labor and estimating the time of completion. • Building customer relationships with mail-outs on maintains special. • Customer Satisfaction Surveys. Controlled all the purchasing and ordering of parts. • Maintaining inventory on air & oil filter, wiper, and other special services including fuel filter. • Ensure that customer troublesomeness, complaints and misunderstandings are dealt with honestly and swiftly. My nine years’ experience in the automotive field has enhanced my proficiency and skill in dealing with customer problems and shop procedures which will compliment what I have to offer in returning back to Quality control inspection. Romaco Inc. / Index Inc. Manufacturing / Capsule filling Machine Quality Control Manager 1999-2002 Pompton Plains NJ 07444 973-616-0440 Responsible For: Improving the In process inspection on partially incomplete parts at all stages of machining. First articles inspection reports, Development and revision of internal procedures. Shop floor QC inspection gauge setup, all machine operators will assist in floor inspection process and record data. Preliminary CP process control sample study on all new projects. SPC to target pacific close tolerance dimension w/six sigma CPK 1.33 or better required by customer. All out source supplier incoming parts are in house inspected; Supplier that is not ISO9000 certified must have inspection reports with parts. Quality Assurance: Execute qualification surveys to assure that suppliers are qualified to provide the specified product, service or process. Conduct on-site quality surveys, First Article Inspections (FAI) and Source Inspections, as required. Project a positive attitude in support of the team, department, continuous improvement, and company goals. Responsible for maintaining all equipment schedules calibration. Geometric dimension tolerance ANSI14.5-1994 Krupp Werner – & Pfliedieder -/Twin Screw Extruder Technology Quality Assurance Representative. 1996-1999 Ramsey NJ 07450 201-327-6300 Responsible for Quality issues: Internal Customer complaints, quality issues on manufacture assemble floor, Processing of corrective root cause report to in-house manufactory or from our outside suppliers. Corrective preventive plan from our supplier with individual who responsible for implementation and when correction measures will be completed. The effectiveness of the preventive measures taken by our supplier was verified, dated signed for completion. Customer material returns authorization number. Material certification reviews, internal audits for ISO 9000 for other related departments. Also created and implemented quality control procedures to interact necessary departments to conform to ISO9000. Geometric dimension tolerance ANSI14.5-1994 Vulcan Tool Company / CNC Machine parts Quality Control Inspector 1995-1997 Union, NJ 07087 908-686-8522 Responsible For: Performing mechanical inspection on partially machined parts. All stages of machining, and First piece inspections must be signed off by QC inspectors, CMM Mitutoyo (manually programming) Internal floor inspection, Visual inspection by operators requirements QC work sheet check list and gauge inspection is required, any job can be stop and rejected for review with project engineers accorded to TQM PROCEDURES. Geometric dimension tolerance ANSI14.5, Y14.36 / Y14.8 Responsible for maintaining all equipment schedules calibration. Note: A small company of 18 employees and one Quality Control Inspector Weiss Aug / Plastic Molding / Metal Stamping Quality Control Manager 3 shifts 1994-1996 East Hanover, NJ 07936 973-887-7600 Responsible For: Production employee floor inspection training on the second shift, SPC process control, visual feature requirements inspection, Also involve in design and fabrications gage fixtures that comply with Customer drawing and Y14.43 specifications, (MMC,LMC,RFS) ( Feature control frame datum) . Geometric dimension tolerance ANSI14.5-1994, Y14.36, CMM, Giddings & Lewis Sheffield (programming) CMM Ram Optical vision computer system (manual) programing) Weiss Aug / Quality Control Inspector – 1992-1994 Responsible For: First three years of modeling inspection in the molding division. Visual inspection process, Spc dimension data input, flow chart 1.33cpk Cast Well Inc. / Aluminum Die Casting / Zinc die casting- 1991-1993 Quality Control Inspector / Production Assistance - Elizabeth NJ 07201 908-355-1110 Responsible For: Performing mechanical inspection on non- machine casting parts for wall thickness requirements as data reference points. All stages of machining of first piece inspections must be signed off by QC department, CMM, Mitutoyo (manually programming) internal floor inspection visual and gauge inspection set-up is required any job can be stop and rejected for review with project engineers. My production responsibility was to assist in a Production Quality Planning Team (PQPT) the deployment of a floor plan to determine the acceptability of inspection points and to focus on each individual steps as well the total process utilizing a constructed process flow charts. ANSI Y14.8 / ANSI Y14.36 / ANSI14.5-1994 Education: Westchester Community College, Valhalla, NY 1988-1991 Area of study: Engineering, /Machinist Denver Automotive Diesel College, Denver CO Area of study Automotive, Transmission, Tune-up, and Engine-rebuilding Morris County College Certificate of statistical process control (SPC) Excel 36 hour Accredited lead audited course. (ISO900) EANJ, Employment Associations of New Jersey Management training Course CMM, Giddings & Lewis Sheffield (programming) Level 1&2 CMM Measurement Concept training Course Completed 1995