Occupation:Engineering Technician |
Location:Trujillo Alto, PR |
Education Level:Associate |
Will Relocate:YES |
Description
Project Eng. for a waste water treatment plant to the new bulk Humalog facility. This plant include two (2) Aeration Tanks of 350,000 gallons capacity each one three (3) Jet Aeration Pumps of 9,800 gpm capacity three (3) Jet Aeration Blowers of 3,200 scfm capacity including a secondary clarifier with the dimensions of 40 ft. dia. 18 ft. swd including electrical area site lighting electrical substation and instrumentation. Encharge of the entire mechanical electrical project. In Avandia Project. Consist of a construction of a new enteric coating solution preparation process. Encharge of the entire mechanical area including HVAC processing piping utility piping and plumbing. In charge of the construction group mechanical project team including engineers And architects
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
Eass Of P. R. | Engineering Coordinator | 1/2011 - 1/2011 |
Eass Of P.R. | Mechanical Lead | 1/2008 - 1/2011 |
Lilly | Manager | 1/2006 - 1/2007 |
Cordis San Germán | Manager Assured Coordination Between The Disciplines And Clientmanager, Assured Coordination Between The Disciplines And Client For Assessmentmanager Assured Coordination Between The Disciplines And Client | 1/2005 - 1/2006 |
Wyeth | Mechanical Construction Coordinator | 1/2003 - 1/2004 |
Gsk | Mechanical Lead During The Execution Of The Pilot Plant Project Design | 1/2003 - 1/2004 |