Climber_bannerad_300x250_15s

Want your profile here?

Becoming a member is easy!

Climber.com works with you to help you advance your career by putting you directly in front of tens of thousands of recruiters in your field. Sign up today on Climber.com

Rssfacility Manager 1640

Jude Seilhan 850-883-7720 work 850-581-1038 home 1981-85 Active duty weapons mech on A-10,F-4,F-15,F-16,F-111 1985-95 Air reserve tech with the AC-130 gunship as a weapons and munitions tec (Retied AFRES) 1995-2005 Eglin AFB construction inspection (gs-809) working multiple multi million construction contract. 2005-Current Facility Manager for the AN/FPS-85 Eglin AFB FL, 250,000 sf, 11 story facility Consist of 4 cooling tower, 3ea 500 ton chillers,2 substation, and 4 switchgear rooms 1981-85 Active duty weapons mech on A-10,F-4,F-15,F-16,F-111 1985-95 Air reserve tech with the AC-130 gunship as a weapons and munitions tec (Retied AFRES) 1995-2005 Eglin AFB construction inspection (GS809) Working multiple multi million construction contract. 2005-Current Facility Manager for the AN/FPS-85 Eglin AFB FL Manager of supply section/Civil Engineer sec5tion/ vehicle control office/hazard waste manager Duties also include the preparing SOW for facility upgrades to QA and inspection of the contracts In 2008 upgrade 6 AHU 500K, renovated 12 new offices with on site personnel, added new hurricane window to a outlaying support facility In 2009 have completed the following upgrades -5kv switch gear\-MCC switch gear/4kv switch gear/secondary substation/AT/FP project, totaling 10M 2010 project Primary substation/remodel 3rd floor command section and all other offices/restroom/change out pneumatic HAVC values to electrical values. Totaling 2.3M This facility is 24/7/365 and all utility systems are redundancy so if one fails it swaps to the other, to maintain the Radar. Manager of supply section/Civil Engineer section/ vehicle control office/hazard waste manager Duties also include the preparing SOW for facility upgrades to QA and inspection of the contracts, I over see all Facility upgrades, also I have input in all radar/computer upgrades In 2009 have completed the upgrades -5kv switch gear\-MCC switch gear/4kv switch gear/secondary substation/AT/FP project, totaling 10M 2010 project Primary substation/remodel 3rd floor command section and all other offices/restroom/change out pneumatic HAVC values to electrical values. totaling 2.3M This facility is 24/7/365 and all utility systems are redundancy so if one fails it swaps to the other, to maintain the Radar.

Aerospace Engineer

Fort Walton Beach, FL

About Me

Industry:

Engineering & Architecture

Occupation:

Aerospace Engineer
 

Education level:

Associate

Will Relocate:

Yes

Location:

Fort Walton Beach, FL