Description
GENOYER (PHOCEENNE) in charge of materials reception (Piping) and cross checking isometrics and mat's available with EGX system In House System, HSE weekly meetings and coordination meeting with the client Note: Award winning during shut-down 2011 And final released of the spare parts and preservation . In charge of all materials involved on the project and its inspection INITEC INDUSTRAIL PLANTS (TECNICAS REUNIDAS) in Singapore, I was responsible of 135 people for receiving issuing controlling materials for Tie-ins in Singapore project * Also technical advisor Piping supervision for Sarawak SHELL project (Malaysia) ** Technical advisor in TOTAL project (Indonesia) And final released of the spare parts and preservation . In charge on isometrics prefabrication and materials run-reservations Materials Controller manager with one specific program MAT-TUB doing materials isos run-reservations receiving and issuing materials inspecting equipments once upon arrival on site and being with MATUB TECNICAS In charge of various on two different projects with TR roles on site construction.