Occupation:Construction & Building Inspector |
Location:Bushnell, FL |
Education Level:High School/GED |
Will Relocate:YES |
Description
James A. Bunner Jr. 7917 bushnell fl 33513 Objective: Project Manager Career Summary: I am a results oriented Project Manager responsible for day to day field operations, installations, and overseeing all subcontractors. My many tasks include managing and directing superintendants and field employees, preparing weekly time reports for all jobsite employees, coordinating job scheduling, analysis, and operations with the superintendents, as well as numerous other tasks to ensure a top quality project. Technical: Computer software – Windows 2007, Microsoft Outlook, M/H2 Build Pro, Primavera P6 Scheduling System, and Timberline Accounting System. Experience: Project Manager RTD Construction, Zephyrhills, FL 11/05-1/10 • Bidding- Prepare and submit bids to the county or city on proposed jobs. • Scheduling- Schedule each stage of construction for waste water treatment plants. • Supervision- Supervise superintendents and subcontractors to ensure job is completed correctly. Completed Projects Reuse System Upgrades Project- Lake Placid, FL. $1,169,000.00 Work consisted of construction of a reclaimed water transfer pump station; a 0.5 MG pre stressed concrete storage reservoir, vertical turbine reclaimed water pumps, Hydrotank chemical feed systems, submersible pumps station, site work, electrical and controls system. San Carlos Pump Station Flow Meters Replacement and Emergency Bypass- Tampa, FL. $252,323.00 Work consisted of new 24” bypass piping including installations of 48” x 24” tap sleeve and valve, hot tap, 48” raw sewage force main, 24” D.I.P. yard piping and replacement of two 30” raw sewage flow meters. Central County Water Reclamation Facility Expansion Phase Two- Sarasota, FL. $11,904,795.00 Work included the construction of the Central County WRF, and included modifications to the existing main lift station including 12 MGD bypass system, convert oxidation ditches into new aeration basins with diffused aeration systems, chlorine contact tanks, new anoxic tanks, new main electrical building, new aeration blower building, site work, yard piping, and restorations. Town of Longboat Key, Lift Station 2H Renovation- Longboat Key, FL. $617,000.00 Work included the replacement of the existing lift station wet well with new 12FT diameter-30 FT deep wet well by tremie-caisson method, pumps, and valve vault, installing new pumps, control panel, piping, electrical, and all accessories, providing bypass pumping, and all other appurtenant work necessary to complete this project. Plant City Water Reclamation Facility Expansion & Improvements- Plant City, FL. $11,427,672.00 As subcontractor RTD completed all work necessary to complete the civil construction of the anoxic basins, three clarifiers, filter addition, chlorine contact chamber additions, RAS/WAS, concrete slab, generator concrete slab, fuel storage tank, installation of wall pipe, excavation and back fill of anoxic basin, filter addition, and chlorine contact chambers, demolition required to perform all necessary construction, and complete process mechanical construction. Idle Wild Pumping Station- Tampa, FL. $400,000.00 Rehabilitation of an existing pump station, by passing existing stations, removing pumps, piping, valves, and reinstall of new pipe. River Oaks Cover Replacement- Tampa, FL $1,300,000.00 Removed and replaced 2 covers on 2 primary clarifiers, installed odor control system and handrails. Project Manager Premier Design Homes of Florida, Tampa 12/03- 11/05 • Scheduling- Scheduled each stage of construction from start to finish for Town Homes and Condominiums. • Supervision- Supervised vendors during construction to ensure the job was completed properly and on schedule. • Customer Relations- Met with homeowners for preconstruction walks and new homeowner orientation. Project Manager Lennar Homes, Tampa Fl. 11/02- 12/03 • Scheduling- Scheduled each stage of construction from start to finish for Single Family homes. • Supervision- Supervised vendors during construction to ensure each home was being completed properly and within timelines. • Customer Care- Coordinated and met with homeowners for preconstruction walks and new homeowner orientation. Receiver Stock Building Supply, Plant City, FL 8/88- 11/02 • Receiving- Unloaded, organized, and stocked materials. • Shipping- Shipped goods via ground transportation. • Inventory Control- Counted and recorded materials available. Submitted inventory reports to upper management. • Dispatch- Confirmed and processed orders. Appraised and resolved situations considering impacts on operations and customer service. • Supervision- Directed employees to ensure orders were processed properly. Boards: I held a seat on the Safety Committee at Stock Building Supply, exchanging, creating, and voting on new policies regarding safety protocol. Professional References: Eric Peters- Carollo Engineers- 941-773-5051 Gita Taef Iranipour- Hillsborough County Water Resource Services 813-272-5977 Wayne Adams- MWH Americas, INC. 941-232-3208 Nicholas Collard- City of Tampa Construction Management Division 813-627-8211 Annie Ross- Town of Longboat Key Public Works Operations Manger 941-650-5275 Glen Richter- Sarasota County Program Manager 941-650-3553