Climber_bannerad_300x250_15s

Want your profile here?

Becoming a member is easy!

Climber.com works with you to help you advance your career by putting you directly in front of tens of thousands of recruiters in your field. Sign up today on Climber.com

RssFacilities Project Engineer

To secure a position as a "CONTRACT / TEMPORARY" Facilities Project Engineer with a progressive organization, where my experience, training, and education may be utilized.

CAD Engineer

Wichita, KS

About Me

Industry:

Engineering & Architecture

Occupation:

CAD Engineer

Ideal Companies:

Lockheed Martin, Aerospace Corp, Northrop Gruman, Hawkerbeechcraft, Raytheon, General Dynamics
 

Education level:

Associate

Will Relocate:

Yes

Location:

Wichita, KS

Work Experiences

9/2004 - 2/2009

Hawkerbeechcraft

Individual Contributor

  • • Created complex office, lab and manufacturing layouts for construction and relocation. • Oversaw the creation and development of the Security Department Upgrade. • Oversaw the creation and development of all plant warehouse facilities. • Created and assisted in the creation of a 600,000 Sq. Ft. Logistics Center • Was responsible for all office rearrangements from planning to completion • Developed CATIA Computer Design basics. • Revised and updated master layouts.

4/2003 - 8/2004

Hitech Associates

Contractor / Freelance

  • Layout Engineer (Consultant) to Lockheed Martin • Created complex office, lab and manufacturing layouts for construction and relocation. • Oversaw the creation and development of the Atlas Program Area. • Redeveloped INTERGRAPH Computer Design basics. • Revised and updated master layouts.

11/1995 - 9/2001

Raytheon Aircraft

Individual Contributor

  • • Produced detailed office, lab, and manufacturing layouts throughout the complex and coordinated the development from start to completion with up to 10 to 50 subcontract personnel. • Developed relocation coded layouts of the area and supervised a 5 to 15 subcontract move team. • Developed CADAM Computer Design basics. • Revised and updated master layouts.

5/1990 - 3/1995

Boeing Company

Individual Contributor

  • • Created office, lab, and manufacturing layouts, and supervised a 10 to 50 in-house or subcontract construction team throughout the modification phases. • Generated relocation coded layouts, and guided a 5 to 15 in-house or subcontract move personnel through rearrangement. • Performed minor estimate of the proposed task. • Assisted in the development of the 20-man on and off-site utility shutdown Committee. I was also a member of the program. • Developed ISICAD Computer Design basics. • Revised and updated master layouts. • Created office, lab, and manufacturing layouts, and supervised a 10 to 50 in-house or subcontract construction team throughout the modification phases. • Generated relocation coded layouts, and guided a 5 to 15 in-house or subcontract move personnel through rearrangement. • Performed minor estimate of the proposed task. • Assisted in the development of the 20-man on and off-site utility shutdown Committee. I was also a member of the program. • Developed ISICAD Computer Design basics. • Revised and updated master layouts. • Created office, lab, and manufacturing layouts, and supervised a 10 to 50 in-house or subcontract construction team throughout the modification phases. • Generated relocation coded layouts, and guided a 5 to 15 in-house or subcontract move personnel through rearrangement. • Performed minor estimate of the proposed task. • Assisted in the development of the 20-man on and off-site utility shutdown Committee. I was also a member of the program. • Developed ISICAD Computer Design basics. • Revised and updated master layouts. • Created office, lab, and manufacturing layouts, and supervised a 10 to 50 in-house or subcontract construction team throughout the modification phases. • Generated relocation coded layouts, and guided a 5 to 15 in-house or subcontract move personnel through rearrangement. • Performed minor estimate of the proposed task. • Assisted in the development of the 20-man on and off-site utility shutdown Committee. I was also a member of the program. • Developed ISICAD Computer Design basics. • Revised and updated master layouts. • Created office, lab, and manufacturing layouts, and supervised a 10 to 50 in-house or subcontract construction team throughout the modification phases. • Generated relocation coded layouts, and guided a 5 to 15 in-house or subcontract move personnel through rearrangement. • Performed minor estimate of the proposed task. • Assisted in the development of the 20-man on and off-site utility shutdown Committee. I was also a member of the program. • Developed ISICAD Computer Design basics. • Revised and updated master layouts.

1/1982 - 4/1990

General Dynamics Corp

Individual Contributor

  • • Produced office, lab, and manufacturing layouts. Led a group of approximately 10 design engineers in the development of the area to be modernized. • Prepared the rearrangement plan of action and, led a 10 to 15 construction team during development. • Revised and updated facility master layouts. • Prepared detailed reports regarding available facility space. • Successfully transferred a F16 fighter jet, via street access, from San Bernardino to Pomona, California, approximately 50 miles. • Developed INTERGRAPH Computer Design basics. • Revised and updated master layouts.

10/1981 - 9/1982

Washington Public Power Supply

Individual Contributor

  • • Developed layouts depicting non-generating nuclear office, lab and manufacturing areas. • Prepared design engineer directions for area development. • Prepared the rearrangement plan of action and led up to a 10-man subcontract move team. • Revised and updated facility master layouts. Prepared detailed reports regarding available facility space. • Revised and updated master layouts.

Keywords