Want your profile here?
Becoming a member is easy!
Climber.com works with you to help you advance your career by putting you directly in front of tens of thousands of recruiters in your field. Sign up today on Climber.com
Recruiters - Try Postings!
Postings.com™ is a must-have for recruiters who want to:
- Find Qualified Candidates
- Find Job orders and Post Splits
- Be Found in Search Engines
- Implement a Social Sourcing Strategy
I am highly professional, dependable, competent, accurate, ambitious and willing to achieve excellence.
I am looking for more than a job. I'm looking for a place to continue my career. It would be wonderful to find a well established, growing company that appreciates hard, dependable, accurate work. I am 37 and would like to have a chance at growing and retiring with the next company I work for.
Surveyor
About Me
Industry: |
Engineering & Architecture |
---|---|
Occupation: |
Surveyor |
Ideal Companies: |
Shaw, RJ Griiffin, Turner, Holder, Heer |
Education level: |
Specialist |
Will Relocate: |
Yes |
Location: |
Auburn, GA |
Work Experiences
6/2000 - 2/2009
Hardin Construction Company LLC
Manager
- I used blueprints and CAD drawing files to provide any and all layout, horizontal and vertical control, and boundary and asbuilt work for several building structures in the Atlanta area. Some of the projects I worked on were: The Bell South Twin Towers at Lindbergh, Cobb Energy Center for the Performing Arts, Piedmont Physician's Plaza, Kennestone Hospital, The W Hotel, The Intercontinental Hotel, 3344 Peachtree, and The Atlanta Botanical Gardens
7/1997 - 5/2000
Self Employed
Executive
- I worked as a sub contractor, assisting several land surveying outfits in metro Atlanta. I was mainly placed in charge of the Construction staking operations, but also handled all types of residential and land surveying tasks as needed.
3/1995 - 7/1997
Nello L. Teer Construction Company
Manager
- In charge of all layout and construction grading on two major highway projects. The first was a two mile section of the I-440 Bypass and the second was a six mile divided highway project on US Highway 1 In Apex, North Carolina.
8/1989 - 3/1995