Description
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
Deepwater Subsea | Bop/Dte Surveyor / Inspector | 8/2018 - 7/2020 |
Nxt | 15 M Bop | 8/2018 - 8/2018 |
Lloyd's Register (West) | Bop/Dte Surveyor / Inspector | 12/2008 - 8/2018 |
Halliburton Coil Tubing Bop | Flow Head Assembly | 12/2008 - 12/2008 |
Fmc | Expro Choke Manifold | 12/2008 - 12/2008 |
Owirs (Open Water Intervention Riser System) | Halliburton Coil Tubing Reel | 12/2008 - 12/2008 |
Fmc | Tsj Speedloc2 Manual Connector | 12/2008 - 12/2008 |