| COMPANY | POSITION HELD | DATES WORKED |
|---|---|---|
| Precision Drilling Rig Solutions | Installation And Commissioning Manager | 4/2010 - 8/2012 |
| National Oilwell Varco | Commissioning Engineer (Robotics) | 5/2004 - 4/2010 |
| (Woodward) | Installed And Commissioned Generator Bus Controller Modules | 5/2004 - 5/2004 |
| World Com | Network Technician | 11/2001 - 5/2004 |
| Exxon Mobil | Nt Server Analysts | 11/1999 - 11/2001 |
| St. Luke's Episcopal Hospital | Network Analysts | 4/1994 - 11/1999 |