Description
Support tender department by approving technical appraisal. Participated in the preparation of Master development Plan for FPSO project. Involved in Identification of corrective action where performance declined below acceptable standards. Worked with FPSO site leads to ensure delivery of contractor FPSO FEED proposal meeting company expectations for scope and quality.( Conversion and R&LE conducted in China and UAE ) Ensured compliance with company and international procedures and regulations. Provided technical support for conducting Basic Engineering of Production and SPOL Well Head Platform. Ensured rapid response to technical queries, technical deviations requests and contractor change requests. Position: Head of engineering department Managed multidiscipline Foroozan Offshore project engineering team. Participated in HAZOP, HAZID sessions and design, PFD and PID review. Reporting to the project manager. Lead the technical evaluation of contractor FEED proposals. Participation in Basic Engineering phase (conducted by TOTAL Company in PARIS-France) and execution of Phase 2 & 3 of South Pars Gas development Project. Preparation of MDP and participation in Basic Engineering of Phase 6,7 &8 of South pars Gas development project.( conducted by Foster Wheeler in Reading -England ) * 1996 - 1999 NIOOC ( National Iranian Offshore Oil Company ) Position: Lead Process Engineer Participation in development of Sirri A & E offshore oil field wellhead platform and production platforms including Basic and Detail design.( Basic and Detail design Conducted by TOTAL Company in PARIS-France) Participation in development of South Pars gas development phase 2 & 3 including 2 Wellhead platforms and 2 submarine pipelines with size of 32 inch and piggy-back line with 110km length. Achieved client objectives, including optimizing the pressure and temperature of oil production unit. * 1993 - 1994 Bonyan Saz Jonob Position: Multiphase Pipe line & process engineer Basic Engineering of multiphase flow lines and connection to first stage separator and crude oil production unit. Reviewed tender documents and assisted in material bid evaluations. Reported any accidents and safety hazardous to management promptly. Study of gas lift system in Aghjari oil wells for Enhanced Oil Recovery. Designed Gulkhari underground multiphase pipeline carrying hot live crude oil in order to reduce the temperature and increase the production of Stock tank crude oil. Achieved client objectives, including optimizing the pressure and temperature of oil production unit. Participated in renovation of number of brown fields (Ahwaz oil production unit, BiBi hakimeh production unit, Aghajari well head and production unit). Participate in HAZOP & HAZID sessions. M ISCELLANEOUS / HOBBIES * Swimming * Chess * Snooker * Reading
Work Experience
COMPANY | POSITION HELD | DATES WORKED |
---|---|---|
Petroiran Development Company (Pedco) | Head Of Fpso Conversion Project Head Of Engineering Department | 1/2010 - 1/2018 |
Petropars Limited | Senior Process Engineer | 1/1999 - 1/2001 |
Niooc ( National Iranian Offshore Oil Company ) | Lead Process Engineer Multiphase Pipe Line & Process Engineer | 1/1996 - 1/1999 |