Occupation:Department Manager |
Location:Lagrange, GA |
Education Level:High School/GED |
Will Relocate:YES |
Description
Systems * Slitter (Euromac) * Automation * Converting * Developed and implemented the following access data bases plant wide. * Maintenance Work Orders * Supplier None Conformance * Quality Control Hold, Root cause, and corrective action with e-mail notification * Safety Training * Shop Floor Data Collection with e-mail notification * Plant wide information monitors with Power Point presentation communicating daily Safety, Quality and Production information. * Teamwork and Continues improvements used to lower scrap, increase rate, reduce downtime, and reduce inventory levels (raw materials, packaging supplies, and finished product). Tredegar Film Products, LaGrange, Georgia 1978 - 2006 A global manufacturer of plastic films and aluminum extrusions. Senior Process Analyst (2005 - 2006) Process Analyst (1996 - 2005) * Built rapport with customers through effective and precise communication. Traveled domestic and internationally (Japan, Europe, and Canada) * Worked effectively on six LaGrange teams as Facilitator. Increased productivity and reduced cost by implementing 5-S and Kaizen methodology. * Participated in team effort that completed several Six Sigma projects which rendered improvements saving the company in excess of $500,000 annually increased productivity generating $1,000,000 annually above budget. * Participated in teams that standardized equipment, processes, and procedures across all Tredegar facilities. * Developed a new process with state of the art equipment that produced a very profitable product and lead a team that transferred that process to two additional locations. Shift Manager (1990 - 1996) * Managed staff of 16-20 rotating shift employees with six years of "no lost time" accidents. * Increased the lb/hour by 20% and increased efficiency by 20% by training operators and modifying equipment. Operator (1979 - 1990) Operator Helper (1978 - 1979) * Performed lab test on film and made adjustments as needed. * Initiated a scrap reclaim line developed the start up, shutdown and run procedures for this piece of equipment. * Operator technician and backup supervisor for three years.