Rss

Contact_user

Kevin B

Team Leader - 20 Years of Experience - Near 03867

Occupation:

Production Supervisor

Location:

Rochester, NH

Education Level:

High School/GED

Will Relocate:

YES

CollapseDescription

Work with manufacturing companies that require help in improving their SAP functionality and Implementations. Westinghouse Electric Machine shop Supervisor: 1987 - 1996 Production Planning: 1996 - 2000 IS Team Lead:1998-2017 Manufacturing Engineer:2001-2017 Implemented an MRP II system called Visibility in 1996 Lead a team of 7-9 people in the implementation of SAP in 1999 - 2000 Implemented a bar coded time collection system called Kronos for improved efficiency for employees Worked with Engineering on all master data loads including Material Masters, BOM's, Routings and Work Centers as required. Implemented a PM Preventive Maintenance system to replace a manual system. Implemented a Warehouse Bar coding for tracking material. Implemented a Mass Data upload system called Win Shuttle to upload master data from excel to SAP also from SAP to Excel. Worked with Westinghouse and CSC Personnel to make many SAP improvements to improve best practices and efficiency's. Implemented SAP to ARIBA/P2P Purchasing solution. 2013 - 2017 Worked with Finance personnel to setup financial reports to all Project managers. Created numerous reports for tracking manufacturing and Productivity. Implemented an In Process QN "quality notification" system to replace a manual paper system. SAP Module experience PM Preventative Maintenance, PS Project Systems, MM Materials Management, QM Quality Management, PP Production Planning, SF Shop Floor Control, FICO Financial Planning accounts payable, over two hundred standard SAP transactions that I have used along with another 50 custom SAP transactions created specifically for Westinghouse.

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseJob Skills

Left_template4_bottom

CollapseKeywords

Left_template4_bottom