Rss

Gregory L

Kindergarten Teacher

Occupation:

Kindergarten Teacher

Location:

Colorado Springs, CO

Education Level:

High School/GED

Will Relocate:

YES

CollapseDescription

Career-oriented position as an Electrical Superintendent, Electrical General Foreman, Electrical Team Leader, Journeyman Electrician or Inspector, which ever, will utilize my skills and abilities to their fullest. PROFESSIONAL LICENSE Colorado Master Electrician, have carried NM, UT, WY and TX Journeyman's ELECTRICAL SKILLS National Electrical Code Motor Control Centers OSHA - 30 hour PLC Wiring NFPA 70E Instrumentation Wiring MSHA - 24 hour Refrigeration Compression Interpreting Blueprints Termination of Cables Interpreting Ladder Diagrams Splicing of Cables Natural Gas Compression Voltages from 1mV to 35 KV Oil Refinery Gas Detection Systems Fire Alarm Systems 04/2017 - Present Self Employed 03/2014 - 03/2017 KENNY ELECTRIC - Denver, Colorado General Foreman/ Foreman/ Lead 04/2013 - 03/2014 MEISNER ELECTRIC - Colorado, Colorado Springs General Forman 04/2012 - 04/2013 BERG ELECTRIC - Denver, Colorado Foreman 11/1989 - 11/2011 KENNY ELECTRIC - Denver, Colorado Superintendent/ General Foreman/ Foreman/ Lead/ Journeyman SUPERVISORY DUTIES * Organization of field operations of industrial and commercial projects valued at up to $6,000,000.00 * Convene with Job Superintendents to assist in scheduling, organizing critical paths and deadlines. * Ensure required equipment and tools were available. * Complete inspections throughout field operation to ensure work is up to specifications and quality standards. * Continually monitor labor force requirements. * Ensure all necessary work is concluded and any modifications or adjustments that were required be completed prior to final inspection. CUSTOMER SERVICE DUTIES * Review job orders and prioritized customer needs. * Plan 6-week schedules and contacted customers in advance. * Meet with customer to discuss job requirements. * Organize any changes or adjustments as necessary. * Kept customer abreast on progress of job. * Resolve any problems with tact and diplomacy. * Accompany customers on inspection of finished work. * Ensured positive relations and satisfaction. ADMINISTRATIVE DUTIES * Plan and initiated industrial and commercial projects. * Review blueprints for determining time and labor requirements. * Interpret drawings, plans and specifications. * Utilized National Electric Code and any Juridical amendments, for the required installation methods. * Provide diagrams and red-lines for changes to existing systems and/or contract documents * Obtain supplies from wholesale companies. * Review major PO's and submittals and provide input. * Keep accurate reporting of hours expended. * Maintain expenditures within the established budget. OPERATIONS DUTIES * Meet with foremen weekly and/or daily to delegate assignments or resolve issues. * Determine routing of conduit systems and wiring requirements. * Ensure all federal, state, and local codes were implemented. * Ensure project specifications are being adhered to. * Maintain complete material inventories. * Responsible for the maintenance and upkeep of a company vehicle. * Utilize the following electrical equipment: Multimeters - Meggers- Amp Probes - Conduit Benders - PVC Heaters - Wire Tuggers - Wire Feeders - Threading Equipment * Utilized the following equipment: Backhoes, Trenchers, Boom Lifts, All-Terrain Forklifts, and Scissor Lifts SPECIAL ACCOMPLISHMENTS * Worked Class 1/Division 1 and Class 1/Division 2 locations. * Particularly experienced with One-Line Systems. * New instrumentation, valve control, and DC power wiring. * Knowledge in job costs and scheduling. MAJOR Projects: Kenny Electric: Ramsey Trains 4 & 5 Natural Gas Cryogenic Facilities General Foreman - Utilities, Power, Metering and PLC control. (a catastrophic explosion transpired at Trains 1 and 2, while our work was in process) Meisner: New Theater Complex: (6) Different Theater formats, for a total of (12), Plus (1) 3-D Experience Berg: Signed a Non-Disclosure with a Federal Government Entity Kenny: Oil and Gas Industry: New PLC's and Instrumentation for new or existing Compressors Stations/ New PLC's and Instrumentation for an existing Refinery/ New Hyper Fuel Systems for existing compressors/ New Hyper Balance Systems for existing Compressors/ New Instrumentation and Valve Control Head End/ New Instrumentation and Valve Control Midstream/ New Natural Gas Cryogenic Production facilities with Amine Systems Starz/Encore Corporate Headquarters: One Line, (2) 5000A and (1) 2000A Emergency services, (2) 750 KW UPS with Battery Rooms, Busway Feeders, (2) Parallel 1250KW Generators with Paralleling Gear Sun Microsystems: DATA CENTER, R&R (2) 500 KW UPS's with (2) 750 Kw UPS's, with Related Switchgear, Conduit and Feeders, Expanded Battery Rooms, R&R (12) 25KW PDU's with (12) 75KW PDU's, NEVER DROPPING A LOAD. Denver International Airport: Runway Lighting Control Building for Runway 31W, Back-up for Edwards Air Force Base Emergency Landing, (3) Mile Long Landing Platform. Also pulled Fiber Optic Control loop, continuous thru the Main Control Tower Olympic Training Center Visitor Center Janus Funds Corporate Data Center Pikes Peak Regional Medical Center Broadmoor Hotel South Tower Leprino Foods

Right_template4_bottom

CollapseAccomplishments

Highlights:

Left_template4_bottom

CollapseKeywords

Left_template4_bottom